search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
68 BUILDING FABRIC; FINANCE & INSURANCE


Using Wraptite® to achieve Ireland’s Home Performance Index certifi cation


A round 11,000 m2 of Wraptite® – the


Proctor Group’s external air barrier membrane – are being installed at


Rockbrook Apartments in Sandyford, Dublin. The 428 apartments, built in two blocks and arranged around two courtyards, are all being certifi ed to the Home Performance Index (HPI). HPI certifi cation includes enhanced levels of airtightness, as part of the overall aim “to produce great quality homes, healthy and comfortable, with effi cient use of resources, minimising waste and destruction of the environment. ”


WHAT IS HOME PERFORMANCE INDEX CERTIFICATION? Readers outside Ireland are unlikely to be familiar with HPI certifi cation. Essentially, it is a residential equivalent to BREEAM or LEED. First


trialled in 2016, the scheme is managed by the Irish Green Building Council. Demand for the certifi cation has grown


in the years since and, according to the HPI website, many developers use the certifi cation as “a symbol of quality assurance” in their developments. In part, that is because one of the fi ve core categories assessed for HPI certifi cation is quality assurance – alongside environment, health and wellbeing, economic, and sustainable location. For areas of the scheme considered to be most important, mandatory requirements are set to ensure a particular level of quality and comfort is achieved. Examples of such areas include water effi ciency, ventilation and thermal bridging, as well as the aforementioned enhanced airtightness. It is in this context that Wraptite has been


specifi ed and, at the time of writing, is currently being installed.


SAVING TIME AND COST WITH ONE MEMBRANE RATHER THAN TWO Rockbrook Apartments features a concrete frame with SFS infi ll stud. The Wraptite membrane, which is both airtight and vapour permeable, is applied to the external face of the wall structure. In this position, the airtightness barrier is moved away from the internal services zone, which simplifi es detailing


NEED FINANCE?


WestgateShort-term Finance have solutions available now


Secured on land and property Amounts 10K to 250K Terms 3 to 12 months Rolled up payments and Interest only 48 Hour Completions No solicitors! 1st and 2nd charges Land with or without planning


100% finance for planning applications - joint ventures considered. We are a principal lender.


Speak to a decision maker today on 0800 262 135


*service available in England & Wales


New from Garador! GaraPro Automation Kit + Door Package plus Fitting for just £949


Garador has launched an all-in-one GaraPro automation solution, combining the renowned reliability of a Carlton or Horizon up-and-over steel garage door with a new GaraPro electric operator with handset and framed retractable gear – all for just £949 + VAT, fully fi tted.


The Carlton and Horizon are two of Garador’s most popular designs, engineered for strength, weather resistance, and low maintenance. An optional Retractable Plus enhancement is available at an additional cost.


This exclusive off er is available through Garador’s nationwide network of approved installers. To learn more, please email or call.


0330 4415 222 promo@garador.co.uk WWW.HBDONLINE.CO.UK www.westgatecapital.co.uk


and reduces the number of penetrations. At the same time, Wraptite’s vapour


permeability allows the passage of moisture vapour and helps to eliminate any condensation risk in the wall. Wraptite has always been a feature of the facade specifi cation at Rockbrook Apartments – and it was originally complemented by an internal membrane acting as a vapour control layer (VCL). “There was a bit of to-ing and fro-ing about the need for both membranes,” says Gerard Butcher, contracts manager at Comer Group Ireland. “Because of how Wraptite performs, we could remove the VCL and save the time and cost of fi tting two diff erent membranes.” The Proctor Group has been on hand


to support the project from the beginning. regional sales manager Tony Ruth has visited site multiple times, and Gerard is complimentary about the benefi ts of such comprehensive support.


01250 872 261 proctorgroup.com/products/wraptite


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92