BUILDING FABRIC 55
New AliDeck “Ultra” Balcony Kit offers huge savings to balcony manufacturers and steel fabricators
D
ue to the present building safety crisis, thousands of new homes are in high demand. With a backlog of new build
projects across the country, there is an ever-increasing demand for compliant and quick-fit innovations. Post-Grenfell, it is imperative that architects and specifiers are seeking the most up to date and cost-effective solutions. We spoke with Richard Izzard, managing director of AliDeck to see how their new “Ultra Balcony Kit” is revolutionising the market once again.
Construction in the UK has remained extremely buoyant across the turbulence of the last few years, particularly within the housing industry. Continual efforts are being made to increase mid- and high-rise developments, with new build projects popping up all around the country in urban areas. Designers and specifiers are therefore
hunting for ever-more practical solutions to enhance their vision as we continue to build upwards. In that vein, AliDeck recently launched a simple and quick-fit solution in the form of their Ultra Balcony Kit. The AliDeck Ultra Balcony Kit is a new
product offering, tailor-made for steel balcony manufacturers working on new-build projects across the UK. The kit consists of the AliDeck Ultra Board, their latest aluminium decking option, AliClad Flow soffit-cladding, and AliRail Vertical Infill Balustrade System, all supplied in kit-form to meet the demands of each customers bespoke specifications, enabling a quick and easy installation. Richard Izzard, managing director of AliDeck,
said “The use of the AliDeck Ultra Board to the balcony flooring, with its integral drainage channel, is a key upgrade and an innovative step forward. The Ultra Board delivers simple specification of a drained decking system, with
only a drainage gutter being required to the board ends to capture the diverted water from the deck.” The extra-wide Ultra Board has a 175mm top
surface, as well as a 60mm wide fixings channel in the centre of the board allowing for lifting eyes to be inserted with all decking boards fixed in-situ. It’s then a simple operation for the fully constructed balconies to be craned into position on site without leaving any decking boards missing. All that remains then is to simply add in
the fixing channel cover clip. The AliClad Flow soffit cladding on the
balcony would usually function as a water management system but since the drainage is handled at the deck level, this isn’t required. The use of AliClad Flow on the Ultra Balcony Kit, installed to the steel frame underside laid level, is simply intended to seal the balcony and conceal the balcony structure from view for an attractive and aesthetic visual impact. “Our Balcony Kits have so far proven to be
an extremely popular solution for many across the market, with a great level of interest being shown by our customers,” continued Richard. “Those already using our kits have shared positive feedback, while some architects are beginning to amend their designs to accommodate our modular balcony and modern balustrade kits.” There are savings available of 50% or more
in total weight by using aluminium balcony components, such as aluminium balustrades, decking, and cladding. AliDeck’s modular balcony kits have also benefited from excellent cost savings due to the increasing prices of steel, which has proved a key factor in the uptake of AliDeck’s modular balcony kits. AliDeck offer their customers high-quality
product design and trail-blazing innovations coupled with first-rate service delivery, all of which has allowed them to establish their reputation as the leading aluminium decking and balcony component manufacturer within the UK. You can be rest-assured your project success is in safe hands with AliDeck. To find out more about the Ultra Balcony Kit, please call or email AliDeck.
01622 534 085
info@alideck.co.uk HBD10_Alideck_FPAdv.indd 1
WWW.HBDONLINE.CO.UK 06/10/2022 09:52
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92