PROJECT REPORT: SPORTS & LEISURE FACILITIES


levels – include triple glazing, optimised thermal zoning and glazing ratios, heat recovery and low energy systems, and the pool microfi ltration system. None of it would have been possible, says Gowdridge, without the support of Gale & Snowden. “We actively sought their expertise to support, train and provide an important soundboard for our own design and technical specialists,” he explains. “Communication between design and build team was integral to making sure Passivhaus design choices – sometimes measured in millimetres – were effectively translated to site.” He also credits Willmott Dixon’s delivery of the high performance envelope and Engenuiti’s CLT design as critical factors.


Underpinning everything was the successful collaboration. The early stages had to be managed through Covid, with the design team having to navigate new ways of communicating with the council and stakeholders. There were also other challenges including rising energy costs, increased supply chain costs and the council’s net zero commitment; these “all required a high degree of fl exibility, partnership and collaboration, ensuring evolving design concepts remained true to brief,” Gowdridge says.


The centre opened in October 2024 and has been positively received by both council and users, including for its reduced running costs, improved comfort and accessibility. While it awaits full certifi cation from the Passivhaus Institute, it has achieved airtightness scores of <0.4 (permeability) and 0.12 (air change rate) – a 90% improvement over standard regulatory requirements. It is expected to save 50-60% in typical energy usage and more than 40% in comparable water usage – supported through the use of greywater harvesting and low-water-usage toilets, sinks and showers – and has achieved a 30% reduction in total embodied carbon.


The project has also been shortlisted for several design, build and public sector awards, and won an iESE Public Sector Transformation Award in March 2025. “The scheme has people architecture and collaboration at its heart,” says Gowdridge, who believes it “sets a new benchmark” for the sport and leisure sector: “As a large- scale Passivhaus leisure centre in the UK, combining low carbon, operational savings, inclusivity and design quality, it is a model for future projects.” 


WWW.ARCHITECTSDATAFILE.CO.UK ADF SEPTEMBER 2025


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84