search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
PROJECT REPORT: SPORTS & LEISURE FACILITIES 39


would be suitable for all members of the community, who perhaps might struggle with the humid and uncomfortable environment of a traditional leisure centre. The result is a “welcoming, inclusive environment that not only reduces energy consumption – both now and in the future – but also better caters for a wide variety of users.”


The swimming pool hall also provided another opportunity to marry the varied aspects of the brief, with sustainability working hand-in-hand with the team’s people-focused architecture. The hall faces absolute south, meaning the windows, as well as offering views into nearby parkland also provide maximum solar gain, helping offset heating demand.


The team installed bespoke glazed screens and automated sliding doors between the learner pool, main pool and changing ‘villages.’ Gowdridge explains: “This not only enables the thermal separation required – ensuring heat is not lost – but, in addition to a purposeful cubicle and changing layout, this also means lifeguards and caregivers have clear


ADF SEPTEMBER 2025


sightlines across a large area.” He adds: “This was an integral safeguarding point to support caregivers of children, local school visits and general pool safety.” They also installed optional privacy screens for specifi c user groups, and an innovative microfi ltration system which removes contaminants from the water and reduces the level of chlorine required – making swimming more accessible for users with respiratory sensitivities or skin conditions. Poor fi ltration was just one of the pieces of feedback received from the community on why certain groups avoid typical leisure centres. Other comments that the design team and council took on board and fed into the design included stronger connections being made with the nearby park – via the large expanse of glazing in the swimming pool area. There is also improved wayfi nding and Makaton signage, fl exible studio spaces and general improved accessibility measures. “Features such as barrier-free entry, Makaton signage, moveable studio walls and LED-lit sport courts not only support


The team had to focus on precisely delineated layouts to ensure consistent and balanced conditions throughout the entire building


WWW.ARCHITECTSDATAFILE.CO.UK


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84