search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
PROJECT REPORT: CULTURAL, CIVIC & FAITH BUILDINGS 41


“This really added to the richness of the project’s resolution.”


This collaboration was key at every stage of the project, from the early design stages through to the graphic design elements and delivery and construction onsite. “Everyone was very collaboratively- minded,” says Nissen. “We managed the process like a relay race, with Sp(r)int Studio managing the client relationship and contractor onsite, where we were more biased towards the front end in the design and detailing. The whole project was an example of good collaboration.” The emphasis on locale and people was woven through the project, with a “clear approach to sustainability that favoured the natural and the local at all times and on every level,” Nissen says. This included many locally-made elements, such as fi lms, interactives, using a local illustrator, local installation labour and construction done within the Nordic region.


ADF JULY/AUGUST 2026


Sustainability was reinforced by reusing existing elements where possible, and building “for the long term” through the use of high quality materials.


Nissen describes the construction process itself as being more like a “theatrical production” in that so much was produced offsite and brought together “in a very fast end process – including, in typical theatrical fashion, some last minute tweaks!” Once all fi nal amends were achieved, the centre opened to great acclaim. Nissen cites TripAdvisor reviews as testament to this; the overwhelming majority rank the centre as ‘Excellent’ or ‘Good.’ Though not without its particular challenges, she says the whole team thoroughly enjoyed working on the project, thanks in particular to the uniqueness of the location and the resultant content of the exhibition. She concludes: “The brief was incredibly interesting, and it was a great voyage of discovery for all our team.” 


WWW.ARCHITECTSDATAFILE.CO.UK


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78