PROJECT REPORT: CULTURAL, CIVIC & FAITH BUILDINGS 35
surrounding protected landscape. Meanwhile, UK-based architectural practice Nissen Richards Studio had been approached by Karl Kvaran of Sp(r)int Studio in Iceland with an idea that the two could work together on joint pitches in the Nordic region, based on their “similar practice ethos and sensibility,” explains Pippa Nissen, director and co-founder of Nissen Richards Studio. “We got on very well, and agreed to the idea of fi nding work we could do together.” Based in Iceland, it was Kvaran who came across the opportunity to bid for the project; and suggested they jointly pursue it.
Going remote
While the national parks of Iceland are undeniably popular with visitors, numbers are considerably lower in the winter months, with the country often experiencing sub zero temperatures and extreme weather events – particularly in remote areas such as Mývatn. Even in the summer months, temperatures only average between 10 and 15 degrees, making a comfortable indoor environment an
essential part of the experience. The key overall element of the brief, therefore, was to “create a place that could offer shelter, especially in more challenging weather,” explains Nissen. “A place that would provide a focus at the centre of the landscape and also a place that would unpack the fascinating geography, geology and ecology of the immediate landscape.” It was also important to all involved in the project that this be accessible to visitors of all ages, “with a special focus on family groups,” adds Nissen.
While the remote location formed the key design cues, it concurrently presented a unique set of challenges to Nissen Richards Studio. “This was one of the most challenging locations we have ever dealt with in that it was so diffi cult to access, not only for us but for the wider team,” Nissen explains. For the UK team, getting to site meant
a fl ight to Reykjavik, followed by an internal fl ight and a long car journey. The project had a deadline in that it needed to be fi nished in time for the busy summer seasons, meaning construction had to take
“This was one of the most challenging locations we have ever dealt with in that it was so diffi cult to access” Pippa Nissen, Nissen Richards Studio
ADF JULY/AUGUST 2026
WWW.ARCHITECTSDATAFILE.CO.UK
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78