search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
46


APPOINTMENTS & COMPANY NEWS; STRUCTURAL ELEMENTS


Marmox Thermoblocks specifi ed on Wigan PassivHaus development


The fi nal phase of a PassivHaus development is just getting under way in Wigan with high performance Thermoblocks from the range of Marmox being used to counter cold bridging beneath a highly insulated timber frame construction. The St. Mary’s project is being under taken for Wigan Metropolitan Borough Council by principal contractor, Tyson Construction with Pozzoni Architecture being the lead architectural consultant and BTP Architects gilling the roll of specialist PassivHaus assessor. All of the Thermoblocks in 100 mm and 140 mm widths, along with boxes of the special Marmox 360 adhesive are being supplied by Travis Perkin’s Blackpool branch. The scheme to provide much needed affordable and easy to heat new homes has been part-funded by the Government’s Department for Levelling Up, Housing & Communities. When complete the development will provide eight one-bed apartments, nine two bed houses and ten three bed houses, plus a further four with four bedrooms. There will also be 16 one and two bedroom bungalows.


sales@marmox.co.uk www.marmox.co.uk ADF02_Marmox_Structural Elements - Bricks & Blocks_Double PR.indd 1 Wraptite® is the solution for Dundee young persons’ home


The Wraptite external air barrier system from the A. Proctor Group has been chosen for its high performance airtight insulation for a new home for young people in Dundee, Scotland. The new £3m single-storey building will be a home for some of the most vulnerable young people in the city where they can grow up in a supportive and caring setting. The project design includes en-suite bedrooms, shared living space, dining, kitchen, and activities facilities, and accommodation for staff. Robertson Construction Tayside appointed Robertson Timber Engineering as the timber frame manufacturer and supplier for the project. Nicola Jackson, Net Zero Projects Lead at Robertson Group explained: “We fi tted the Wraptite membrane in our factory in Elgin. A very helpful toolbox talk and practical demonstration was delivered by the A. Proctor Group representative to operatives and the design team prior to developing detailed design information. We are happy with the performance of Wraptite and would certainly consider it on future projects.” The Wraptite air barrier system provides a fully self-adhered vapour permeable air barrier certifi ed by the BBA.


01250 872261 www.proctorgroup.com ADF02_A Proctor_Structural Elements - Membranes_DPR.indd 1 Project2_Layout 1 08/09/2021 12:29 Page 1 05/02/2024 09:13


BUILDING INSIGHTS


IN ASSOCIATION WITH


‘Introducing the BJELIN Hardened Wood Flooring brand and its innovative solutions’


Scan the code above to listen or visit insights.netmagmedia.co.uk/podcasts Episodes 2 & 3 coming soon... ADF02_BJELIN_HP.indd 1 WWW.ARCHITECTSDATAFILE.CO.UK 06/02/2024 09:08 ADF FEBRUARY 2024 05/02/2024 09:01


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84