DESIGN
Floor plan of the vaccination centre. No waste is
produced during the construction process, which is good for the environment
are precise, saving time and money and generating less waste.
The benefits Using modular construction can reduce the time scale of a project by 50 per cent compared to traditional methods. However, using this method does not mean that designs are replicated; a unique design is created for each project depending on individual requirements. A modular system allows for great
flexibility as modules can be added at any time for expansion, but it also enables quick and easy disassembly and transfer. The modules have a rolled steel structure that forms a resistant and durable frame that is also self supporting. No waste is produced during the construction process, which is good for the environment.
Conclusion The vaccination centre was constructed using a flexible modular method, which was fast and efficient and is also environmently friendly and cost saving. It has also provided an answer to the needs of the community and is in line with the latest international trends in health architecture.
IFHE DIGEST 2019
IFHE
Materials used during the project. 61
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76