INFORMATION MANAGEMENT TECHNOLOGY


equipment to ensure optimal working conditions for surgeons. It is clear that constant ventilation of an


operating room is mandatory, remaining under positive air pressure, to prevent the entry of bacteria into the room, significantly minimising the risk of infection to the patient. However, ventilation plant need not operate at maximum levels when no operation is in progress. Integrated control systems allow efficient use of energy, automatically adjusting ventilation and other key parameters when there is no surgery taking place.


The biggest challenge The biggest challenge to the successful completion of the new theatres was the time at which the project took place. In 2020, Hospital Alemán completed the purchase of a comprehensive system of modular operating rooms from Karl Storz Company. Then the pandemic started and travel restrictions came into force. However, against all odds, the plan to build a surgical facility incorporating the latest technology continued.


Process In the first stage, programming and design were developed remotely. The meetings were held online, where the client – Hospital Alemán – AFS Arquitectos, and the system provider, agreed on the way to


meet various different needs. In a second stage, the construction


progressed through collaboration between the local and international personnel involved, and with the equipment supplier able to view progress via video. This also helped to resolve any installation issues. Then the materials and integration equipment arrived from Germany. To cater for the distances between those


in charge of this great project (part of the team was in Germany, another part in Brazil, and the work was being carried out in Argentina), weekly meetings were held to show the progress made. The supplier company subcontracted a local business to carry out the work, making its own staff from Germany available to train those ‘on the ground’. They stayed for a certain time, and then had to return. Thereafter, any issues were resolved through video calls. Despite some difficulties along the way, but always with perseverance, as a team we managed to successfully build this new modular and integrated system of state-of- the-art operating rooms.


n Acknowledgment


This article, titled ‘Innovative solutions for operating rooms’, first appeared in the IFHE Digest 2023. HEJ would like to thank the author, the Digest’s Editor, and the IFHE, for allowing its reproduction in slightly edited form here.


Maria Julia Souto


Maria Julia Souto graduated in Architecture at Buenos Aires University (Argentina) in 2012. After a journey of collaborations with architects and companies, she has acquired extensive design-build healthcare project experience at AFS Arquitectos.


She specialises in highly complex area development within healthcare buildings. Her key projects to date have included Sanatorio Finochietto (2014), Sanatorio Anchorena San Martín (2018), and, most recently, Hospital Alemán Torre Juncal II (2022).


CONNECT HEALTH NURSE CALL FOR HEALTH CARE


CONNECTED Wired & Wireless COMPLIANT HTM08-03 CERTIFIED Cat1 Radio


+


FOR MORE INFO VISIT WWW.C-T.CO.UK EMAIL: INFO@C-T.CO.UK OR CALL 01202 573300


Technology for those who care


November 2023 Health Estate Journal 35


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68