search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
ELECTRICAL SYSTEMS


Apex says the manufacture of ready-made components in a controlled environment ‘reduces on-site labour, minimises disruption, and ensures quality’.


downtime, so the upgrade of technology and expanding infrastructure are achieved quickly and efficiently. As the world strives to become more


environmentally friendly, pressure is on everyone to reduce carbon output. Traditional wiring is characterised by its inefficiency and high levels of waste, whereas modular systems are designed with the environment in mind. Prefabricated components minimise waste during manufacture and installation, with modular removing the need for excess materials and on-site assembly, so fewer resources are consumed, and less waste is generated.


We must all think differently to address the climate crisis. Promoting efficient use of resources, and reducing the environmental impact, healthcare facilities can contribute to broader sustainability goals, as well as enhancing their own operational efficiency. Apex is committed to sustainable practices in everything we do, and the utilisation of modular instead of traditional ensures long-term sustainable solutions and a healthier future for generations to come. An innovative force in modular, Apex has been driving advances in the healthcare sector for many years, with a commitment to quality, innovation, and customer


satisfaction. Founded in Durham in 1980, Apex has forged a global reputation for the supply of cable, cable assemblies, and accessories, for high and low-level power distribution systems. With a fully trained and qualified team of experts, the business provides first-class service, developing and delivering solutions across the globe. Apex boasts a 160,000 ft2


HQ in the city


of Durham, with overseas operations in the UAE and Australia. With continuous investment in


connector technology and manufacturing techniques, Apex Wiring completes the entire manufacturing process from design to supply.


August 2024 Health Estate Journal 69


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72