search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
ESTATE DECARBONISATION


Chris Yeo


Above: Roof-mounted solar PV on the Academic Block roof at the John Radcliffe Hospital. Right: New LTHW heating mains pipework installed as part of the de-steaming works – the external route at ground level.


n The fitting of 870 solar panels on 11 buildings, covering 1,699 m²,with a capacity of 357 kWp.


n Introduction of variable flow heating distribution systems through the installation of 7 new variable speed pump sets and 38 2-Port valves.


n Replacement of 20 belt-driven air-handling fan units with EC AHU fan assemblies with integrated inverter drives and BMS Modbus control units.


n Replacement of 22 chiller condenser fans with Electronically Commutated (EC) axial fan units and controls.


n A BMS upgrade (33 obsolete controllers replaced) and strategy optimisation. n Pipework insulation.


The work at the John Radcliffe meanwhile entailed: n Relocation and upgrading of the compactor to allow for the extension to the Energy Centre building.


n De-steaming works. n Replacing obsolete equipment with new. n Removing asbestos in some areas. n Conversion of the Energy Centre from a steam to a Primary Low Temperature Hot Water Energy Centre.


n Installation of a Primary Low Temperature Hot Water link to a water source heat pump.


n 1,342 solar panels fitted to seven buildings covering 2,682 m², and with a capacity of 584 kWp.


n Installation of heat pumps. n Replacement of 32 existing belt-driven air-handling fan


Chris Yeo, director of Low Carbon Solutions at Vital Energi, is the business’s account manager for this PSDS project, and has supported the development and delivery of the grant- funded scheme. He has over 25 years’ experience in the energy and construction industry. He specialises in Energy Performance Contracting, so has expert knowledge in developing carbon reduction projects that deliver true and verifiable savings.


April 2025 Health Estate Journal 25


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68