NEW BEGINNINGS
Mapei’s subfloor preparation products and flooring adhesives have been specified for new state-of-the-art maternity suite.
Works to a brand-new, state-of-the-art maternity suite at a hospital in Sutton Coldfield, Birmingham have now been completed, with Mapei products used exclusively for the installation of vinyl and safety flooring.
Following a site visit to the Fothergill Building, the existing substrate to the main area of the fourth floor was identified as a concrete slab overlaid with an old levelling compound and vinyl flooring adhesive residues. As the concrete substrate was generally solid and sound, work began to mechanically remove the existing smoothing compound and adhesive residues.
Once cleaned and vacuumed, the prepared substrate was primed with Mapei’s solvent-free, acrylic based Eco Prim T Plus, diluted with one part to two parts of clean water. Mapei’s two-part cement based smoothing and levelling compound, Latexplan No Ammonia was then applied to infill areas. These areas were also primed with Mapei Eco Prim T Plus as this adhesion promoter encourages inter-coat bonding and its low odour made it the ideal choice of primer.
To ensure lower sections of the substrate met existing floor levels, Mapei Latexplan No Ammonia was applied followed by a third application of Mapei Eco Prim T Plus to the entire floor. A third and final application of Mapei Latexplan No Ammonia was then applied to ensure the subfloor was completely level, and to provide a single, constant floor to receive the vinyl floorcoverings – something that was essential, given the hospital setting.
28 | VINYL & LVT
Once the substrate was prepared, Sheldon Flooring, working for Main Contractor E Manton LTD, installed Polyflor Expona Flow for a contemporary finish. The vinyl sheets were bonded with Mapei Ultrabond Eco VS90 Plus, a high temperature universal acrylic-based adhesive with very low VOC that is ideal for use with most resilient floorcoverings.
The substrate within the en-suites was terrazzo tiles that were solidly bonded and laid to a slight fall which accommodated drainage. The substrate was mechanically abraded and once prepared, it was primed with Mapei Eco Prim T Plus. Mapei Latexplan No Ammonia was then applied to ensure a complete smooth surface. High performance, one-component polymer-silylate adhesive Mapei Ultrabond Eco MS 4 LVT was used to install heavy-duty wet room safety flooring Polysafe Quattro, specifically designed to provide a high degree of slip resistance in continually wet areas.
The utility rooms were installed with Polysafe Vogue Ultra vinyl flooring which was fixed with Mapei Ultrabond Eco VS90 Plus, a Mapei adhesive suitable for resilient floorcoverings, and ideal for areas subjected to static and dynamic loads.
Following the completed work, Contracts Manager at Sheldon Flooring Dirk Baker said: “From start to finish Mapei provided an excellent service, backed up by products you can trust.”
www.mapei.com
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60