search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
YING FIELD compound to ensure a long-lasting and attractive floor finish for every project.


high levels of foot traffic, a heavy-duty levelling compound should be selected for its high compressive strength which will create a durable surface for subsequently applied floorcoverings.


Such levelling compounds are a popular choice for preparing subfloors in retail settings, schools and hospitals. For example, the self-levelling properties and heavy-duty applications of F. Ball’s Stopgap 300 HD ensure a completely smooth and even base, helping floorcoverings withstand the demands placed on them.


OTHER LEVELLING COMPOUNDS There are a number of other particular situations when a levelling compound with additional features will be desirable.


When undertaking exterior flooring installations, it is important to choose a levelling compound that is suitable for outdoor use, to benefit from freeze/thaw resistant properties, for example.


Working over calcium sulphate screeds also requires special consideration. Calcium sulphate screed manufacturers advise that a calcium sulphate-based self-levelling compound is used to create a base for floorcoverings over this type of subfloor. The reason for this is that the application of cement- based products onto calcium sulphate screeds can result in a chemical reaction that causes the formation of ettringite, a crystalline material that can cause floor failure, where the two materials meet.


twitter.com/TContractFloors


PRIOR PREPARATION Before a levelling compound is applied, the subfloor needs to be suitably sound, smooth and dry enough for the receipt of new floorcoverings. This may necessitate repairs to the subfloor or the removal of any surface contaminants and old adhesive residues (when not using a levelling compound that can be applied directly over the top).


F. Ball recommends that a moisture test is then conducted to determine subfloor moisture levels. Where a moisture test indicates that the relative humidity (RH) level within the subfloor is above 75% (65% if wood floorcoverings are to be installed), a waterproof surface membrane will be required to prevent floor failure.


The application of a primer is also required in almost all circumstances to promote adhesion of subsequently applied levelling compounds and stop the rapid drying of levelling compounds when applied over absorbent subfloors. It also prevents pinholing, caused by tiny bubbles resulting from the slow escape of air from the subfloor, which burst on reaching the surface, leaving small pinholes or craters as the levelling compound cures.


After these steps have been undertaken, the application of an appropriate levelling compound is the final stage in the subfloor preparation process before new floorcoverings can be installed.


www.f-ball.com LEVELLING COMPOUNDS | 19


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50