OUTDOOR INSTALLATIONS GREAT OUTDOORS
Stephen Boulton, technical service manager for F. Ball and Co. Ltd., talks through achieving perfect exterior flooring installations and selecting the optimum products at each stage along the way.
The steps to achieving a professional flooring finish outdoors, as well as in transitional areas such as entranceways, are much the same as when working indoors. The main differences are that the products used must be formulated for outdoor use and external projects frequently involve floorcoverings that aren’t typically installed indoors, such as artificial grass.
When undertaking exterior flooring installations, contractors still need to create a suitably smooth and stable base on which to install the floorcoverings, as they would for an interior installation. Priming the subfloor beforehand is just as important. The flooring contractor can then proceed to install chosen floorcoverings. In each case, the contractor needs to use products that are designed for outdoor use.
EXTERIOR SMOOTHING
COMPOUNDS External flooring installations typically involve working over concrete or sand/cement screeds. It’s also possible that the screed will be uneven or damaged, particularly if the project is a refurbishment. In most cases, a smoothing compound will be required to create a surface that is smooth and level for floorcoverings to be installed. The smoothing compound must be weatherproof and able to withstand extremes of temperature.
For example, F. Ball and Co. Ltd.’s Stopgap 850 Exterior is purpose-designed for external application. It is suitable for smoothing and levelling screeds, including those that have become worn, impact damaged or weathered and can be used for patios, walkways, and balconies. Its resistance to water once fully cured also makes it ideal for use in locations such as garages.
If desired, the smoothing compound can be used as a standalone exterior wear coat, for example, over a garage floor, and is also suitable for the installation of artificial grass or for use with vinyl or matting in transitional areas, such as entranceways. It can be applied in thicknesses between 5mm and 15mm, and, when fully cured, it is resistant to frost and rain.
Mixed with aggregate, Stopgap 850 can be filled up to 50mm for use where concrete or sand/cement screeds are particularly damaged or worn. Alternatively, contractors may opt for a ready- to-use repair mortar that is suitable for exterior floors to repair areas of damage, such as F. Ball’s Stopgap 460 Exterior Repair, before applying the smoothing compound.
28
As always, it’s essential to prime the subfloor before the application of a smoothing compound. Priming absorbent subfloors of concrete or sand/cement screeds helps to promote adhesion and prevents the unacceptably rapid drying of subsequently applied smoothing compounds.
ADHESIVES FOR EXTERNAL USE When using suitably water-resistant products, contractors can proceed straight to installing floorcoverings once the smoothing compound is fully cured. Again, it’s essential to choose an adhesive suitable for outside use.
Epoxy or polyurethane-based adhesives are the traditional choices for installing floorcoverings in outside areas. Such adhesives are tolerant of water, frost and snow.
The latest advancements in adhesives technology have enabled F. Ball to create a one-part, moisture-curing adhesive for internal and external heavy-duty applications: Styccobond F73 PLUS.
The adhesive has been specially developed to provide the high bond strength required to hold a wide range of floorcoverings in place in the most demanding environments, such as in areas subject to surface water, heavy loads and high foot traffic, including in transition areas and entranceways. The adhesive offers high initial grab, and fibres in the adhesive limit early lateral movement, an advantage when installing LVT.
Styccobond F73 PLUS is also easier to apply and faster curing than traditional alternatives, requiring as little as 90 minutes to secure floorcoverings. The adhesive can be trowel-applied to a wide variety of sound, smooth subfloors, including concrete and sand/cement screeds. Its fast-setting properties allow welding of sheet floorcoverings to take place from as little as two hours.
https://f-ball.com/en
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44