THE RIGHT MOVE Bostik brings the flooring home on major residential project.
The Oaklands House development on Old Oak Common Lane represents London’s biggest regeneration since the 2012 Olympics. Constructed by Vistry Partnerships, it has transformed a derelict brownfield site into a new neighbourhood, providing local people with 605 homes, as well as office and commercial space across three major blocks.
Titan Interior Solutions was appointed to install the flooring throughout the 24,000m² housing-led development in west London. They turned to long-term supplier Bostik, who could provide the expert subfloor preparation advice, as well as its market-leading products, needed to make this site’s regeneration a reality.
FAIL TO PREPARE, PREPARE TO FAIL Once called upon by Titan Interior Solutions, Bostik’s team of expert technical consultants visited the site to inspect the subfloors and conduct moisture tests, enabling them to make their recommendations for how best to install the floorcoverings.
The team discovered several inconsistencies on the surface of the anhydrite-based subfloor. The surfaces of some of the lower levels were hard and dense, and therefore difficult to abrade, while areas of the upper levels contained lignite or layers of soft laitance, making them easy to abrade.
In addition, while moisture tests showed that most areas of the buildings were relatively dry, a small number of rooms exhibited high readings. Bostik found that this was because those rooms were being used for storage, causing the covered floors to struggle to breathe. Spillages to these surfaces had compounded the problem and meant that water had been allowed to build up on them.
“The report that Bostik provided after surveying the anhydrite slab was invaluable to how we prepared the subfloors,” comments Alex Fletcher, Operations Manager at Titan Interior Solutions. “It fed into everything we did and enabled us to move
twitter.com/TContractFloors
ahead, confident that we could do the job to the best standard despite the inconsistencies in the subfloor.”
THE RIGHT SOLUTIONS In the dry areas of the buildings, the first step in the preparation process, once the subfloor had been mechanically prepared and vacuumed, was for Titan Interior Solutions to prime the subfloor with Bostik Screedmaster GRIP E946 EPOXY PRIMER. This two-component, water- disposable primer cures via chemical reaction and is coloured so coated areas can be easily identified.
In the areas where moisture was a problem, Bostik Screedmaster HYTEC E570 ONE COAT, the solvent-free, epoxy surface DPM was used prior to priming.
Titan Interior Solutions then applied Bostik Screedmaster SL C 540 FLOW. The two-part, protein and casein-free, cementitious smoothing compound offers improved workability, with its high-flow, easy trowelling properties making it ideal for largescale projects such as this one where there is a significant area to cover.
Finally, the company applied the brand-new STIX A740 MULTI BEST, Bostik’s resin-modified, solvent-free acrylic adhesive for use with resilient floorcoverings. The unique formulation of Bostik STIX A740 MULTI BEST enables it to offer extremely strong wet bonding while also providing a long open time, making it the ideal choice for a range of floorcoverings.
“Bostik was superb to work with throughout the project, making great recommendations and visiting the site numerous times to confirm if DPMs were needed for certain areas,” concludes Alex. “We have a great working relationship with Bostik, with both their technical and sales teams, which has led to high volumes of repeat business over a number of years. I would highly recommend using not only their products, but their team.”
www.bostik-profloor.co.uk FEATURE | 39
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48