search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
PROCESS EQUIPMENT UPDATE


COMPRESSOR CASE STUDY


Claudia Pröger explains how an expert in the sector provided a quick solution for a damaged compressor cylinder


W


hen a leading producer of suspension polyvinyl chloride (S-PVC) in Germany experienced a compressor


cylinder breakdown, Burckhardt Compression was selected to carry out the repairs due to the specific requirements of the project, including a tight timeframe and high safety standards associated with the process. Te compressor was used to compress oxygen to high pressures and had reached the end of its service life. Te local team from Burckhardt


Compression reverse-engineered and rebuilt the cylinder with higher quality materials and a built-in liner that can be easily replaced to ensure simple maintenance procedures. Tese design improvements aim to reduce costs and make the compressor more efficient in the long run. In addition, the repair team identified


existing valves and other components that could be reused. Tis meant that the environmental impact of manufacturing and disposing of old parts would be reduced, minimising the amount of time and resources required to replace components.


The cylinder before it was repaired at Burckhardt Compression


Germany’s service centre


Burckhardt Compression managed the


repairs from start to finish and provided on-site assembly support from its local field service representative. Tis ensured that the cylinder met the highest safety standards, downtime was reduced, quality control was improved and the customer’s support was enhanced. Te partnership between Burckhardt


Compression and the customer was crucial for successful completion, ensuring that all expectations, including budgetary restraints, deadline, safety, operational availability and equipment quality were met.


The new cylinder in its installed condition


6 www.engineerlive.com


FAST AND EFFICIENT Te project was completed within only eight weeks, after which a spokesperson for the customer commented, “We’re very pleased with the re-engineered compressor


cylinder. Its team delivered a solution that met our tight timeframe and specific requirements. Te project’s success was a result of our partnership with Burckhardt Compression, its commitment to safety, quality and its ability to deliver exceptional results.”


Te company’s expertise in compression solutions across a wide range of applications has earned it a reputation as an expert in the industry. Its ability to deliver quick, cost-effective and sustainable solutions makes it the partner of choice for companies seeking to reduce their carbon footprint while enhancing their production processes’ efficiency.


Claudia Pröger is with Burckhardt Compression. www.burckhardtcompression.com


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52