RENEWABLE ENERGY


PHOTOVOLTAIC HARNESS CUTS SOLAR CABLING COSTS N


exans has designed the new Keylios photovoltaic harness to help developers, installers


and operators of utility-scale solar farms cut the low-voltage (LV) direct- current (DC) cabling costs for their photovoltaic modules. Specifying a harness removes the need for cables to be cut to length on site, as the complete assembly of cables and connectors is manufactured under controlled factory conditions and delivered ready to fit. This offers both improved quality and reliability by reducing the number of connection points, while the major reduction in installation time and material wastage can reduce the overall cost of LV DC


cabling by up to 15%. “Nexans is fully committed to the global energy transition,” says Olivier Dervout. “50% of faults on solar farms are due to cabling and connectors. To decrease those risks, we have


developed new solutions such as the Keylios PV harness. Easy installation and decreasing the risks on-site offer substantial CAPEX and OPEX savings.” Nexans engineers considered


three main factors: first, there was a need for high-quality, ready to connect products, so that strings of photovoltaic modules can be hooked


cabling solutions were created to eliminate risks such as connection faults and fires, which account for 50% of failures. Finally, there was the need for developers to reduce the amount of cable and components they use during installation. The result is the Keylios. Each


harness is sized and manufactured on a bespoke basis and delivered as an easy to handle kit that ensures it will be a perfect match for the customer’s installation. In a typical solar farm installation of


370MW, using a harness reduces the length of LV DC cable required from 4,200km to 2,800km. This reduces the LV DC capital cost by 15%. Less cabling also makes it possible to reduce the size and cost of components, such as connection boxes. 


up quickly without the quality risks associated with cable preparation on site. Second, long lasting and reliable


For more information visit www.nexans.com


www.engineerlive.com 35


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52