[RIGGER’S CORNER]


DIRTY WORDS AND PHRASES ASSOCIATED WITH LOAD HANDLING ACTIVITIES


BY: JOE KUZAR, ASSISTANT TECHNICAL DIRECTOR, INDUSTRIAL TRAINING INTERNATIONAL (ITI)


We hear them all the time. In meetings. On the job site. We don’t even react. We continue to listen intently and take notes, but we don’t address it. Tey have become part of our everyday vernacular.


Tese dirty words and phrases are not the ones that George Carlin spoke about in his legendary 1972 comedy routine, Seven Words You Can Never Say on Television***. Te dirty words and phrases that I speak about can have catastrophic consequences on a job site during a load handling activity if they go unchecked. Too many times I have heard:


• “Let’s try this.” • “I think this will work.” • “We’ll see what happens.” • “Tis should work.” • “Hey, y’all watch this!” (My personal favorite.)


When we hear these dirty words and phrases, we should stop what we’re doing and realize that we don’t have a plan and working without a plan can be dangerous and not very productive. During the planning phase, we can use our imagination


and be creative. We can think outside the box and explore new ways to handle loads. We can consider new methods and equipment that we normally don’t use. We may find safer and more efficient ways. All of this is possible during the planning phase. We do the load handling activity on paper and identify gaps. We then determine how we are going to fill or bridge the gaps, but we only do this during the planning phase. None of the preceding paragraph should be attempted during the execution of the plan. Our plan should be so well written that personnel that are not familiar with the load handling activity can quickly be introduced and contribute. Of course, they should be qualified to do so and this should also be done as part of the planning phase.


Our plan should address the following areas:


• Te Load • Te Load Handling Equipment • Te Rigging • Te Environment • Te Job Site


80 SEPTEMBER–OCTOBER 2018 WIRE ROPE EXCHANGE


• Te Personnel • Unique (Site Specific) Policies and Procedures • Possible Contingency Plans to Address the Most Probable Issues


Te size of


the plan should be relative to the complexity of the load


handling activity. Proper


planning leads to a procedure- based execution which has fewer errors. Executing a load handling activity with knowledge-based execution requires personnel to rely upon their knowledge and experiences. It should be noted that not all experience is good experience. Given the choice between the two, procedure-based


execution driven by a well-developed plan results in a safer and more efficient execution of the load handling activity with fewer dirty words and phrases. If you hear a litany of dirty words with regularity at


your organization, it might be time to take a look at the ITI Lift Director & Critical Lift Planning Course. Te three-day course will address the responsibilities of a Lift Director as identified by OSHA and ASME (P30.1 and B30.5), as well as the all the steps listed above as part of a proper lift plan. Learn more about the course by visiting www.iti.com/ lift-planning/lift-director-critical-lift-planning Stay Calm and Rig Safely! y


Since 1986, ITI has specialized in crane, rigging, and lift planning training. Learn more at iti.com.


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84