26 GENERATORS


Emergency backup provided for the largest data centre in Southern Australia


An Adelaide-based data centre provider - YourDC - provides full data centre services for the people of Adelaide. Customers need to access high amounts of data 24/7 which is why the company needed to invest in a completely reliable backup power supply.


server racks, making it the largest data centre in South Australia. The centre has a capacity of


D


8 MW, floor space of 6,000 square metres and is YourDC’s second facility. Furthermore, it is Australia’s first TIA-942 rated 3 certified data centre, a globally accepted standard for building and operating data centres accredited by the American National Standards Institute (ANSI). MTU Onsite Energy was chosen to supply two 16V 2000DS 1250 generator sets as an emergency backup power solution for the DC1 Edinburgh Parks data centre. These generator sets are now serviced by long-standing local


C1 Edinburgh Parks is a state- of-the-art data centre with 800


“In mission critical applications, you need a partner who you can rely on. MTU Onsite Energy products provide us with this peace of mind.” - Scott Hicks, CEO YourDC


MTU partner, Penske Power Systems. Power for the facility is supplied by four 2MW full-load capacity transformers through two separate substations. However, natural disasters or system failures can cause power outages. In the case of an outage, the


uninterrupted power supply will go online initially, prior to the MTU Onsite Energy generator sets starting up. The


Worldwide Independent PowerMay 2018


time delay between a loss of mains power and the genera- tors resuming power supply to the centre could be as little as 10 seconds, which means that the uninterrupted power supply can be designed with less capacity. The generator sets consume diesel which is supplied by a tank directly onsite. The tank holds enough fuel for five days of emergency operation. As the DC1 Edinburgh Parks


data centre is TIA-942 rated 3 certified, power supply is sub- ject to the highest standards.n In addition to server protection against physical events, redundant capacity components are also required as well as multiple independent distribution paths serving computer equipment. The 16V 2000DS 1250


genset is said to combine www.gmp.uk.com


exceptional high load factor capabilities with low maintenance requirements, yielding low lifecycle costs. Furthermore, the generator


sets are designed to run in the Australian climate which means that they are capable of running in ambient air temperatures up to 50⁰C. There gensets feature a


reliable engine which is able to serve 100% of the load requirement in less than 10 seconds. The engine has a compact packaging design allowing more space for server racks.


www.mtuonsiteenergy.com


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48