search.noResults

search.searching

note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
44 FLOORS & FLOOR COVERINGS; FINANCE & INSURANCE Norbord's new flooring is very hush-hush!


Designed for both domestic and non-domestic applications, CaberAcoustic from Norbord comprises 28mm and 32mm variants of tongue-and-grooved particleboard panels with a 10mm sound-reducing layer bonded to the underside. This specially-designed layer,


made in the UK from recycled felt, reduces impact noise transmission by up to 19dB. It also helps reduce airborne noise when used as part of the appropriate flooring system. The board's tongue-and-grooved edge profile gives a tight, easily-fitting joint and maximum strength when fixed using Norbord's CaberFix D3 adhesive.


www.norbord.co.uk Designer Contracts celebrates 25th year


Designer Contracts, one of the UK’s largest floor- ing contractor, is to open three new regional facilities across the country. Opening to meet increased demand for its services, the new facili- ties will be operational by Spring and represent a


significant milestone for the company in its 25th year of business. To support the expansion, the company has promoted Louise Walters to merchandise and marketing director and Gary Tynan to divisional director. Gary will continue to oversee the smooth running of the Southern, Thames Medway, Thames Valley and South East and will also look after the new Kent and East Anglia regions. Louise will continue to head up the company’s buying team as well as handle all marketing.


01246 854577 www.designercontracts.com Prestigious London development provides successful test for Norcros


Sugar Quay is a new residential site, currently under development. It is situated in one of the most prestigious riverside locations still to be developed in London on the north bank of the River Thames near to the Tower of London. The core of the project is the replacement of a 1970s office block with a contemporary mixed-use Foster & Partners scheme. This will comprise apartments built at basement level, at ground floor level and also in blocks of nine to eleven storeys. There will be 165 private residential apartments, as well as studios and one, two, and three- bedroom apartments. Norcros Adhesives carried out a programme of on-site tests, using the new Norcros Pro Gyp-Base Fast Track Sealer, which greatly reduces the minimum drying times normally applicable for anhydrite screeds. Developed and tested in association with Gypsol, Norcros Pro Gyp Base offers a fast track solution for tiling on to both heated and unheated anhydrite screeds. At the conclusion of the tests there was no evidence of debonding of tiles or cracking of the grout joints in any of the bays and no evidence that the Pro Gyp Base had not worked effectively. Norcros Adhesives were able to provide full on-site support and technical back-up. This includes on-site training, as well as a full programme of checking and monitoring throughout the installation process.


01782 524140 www.norcros-adhesives.com


WWW.HBDONLINE.CO.UK


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68