GENERATORS


Generators are key to the installation of subsea power cables


Power Electrics supplied two 1250kVA generators to power subsea cable installation equipment for a global submarine communications company. The generators provided power for the motor reels that are used to lay the cable and were set to work in ‘Runner – Standby’ configuration, meaning that power would not be lost in the event of a fault with one of the generators. Bespoke service packs were also provided to enable regular on board maintenance, reports the company.


P


ower Electrics currently maintains a fleet of over 40 megawatts of genera- tors, ranging from 550kVA to 2100kVA, designed to be rapidly


deployed around the UK from a nationwide depot network. The company maintains a highly-skilled


special projects team on hand to assist with the synchronisation and installation electric generator sets. Generators are available complete with external fuel tanks, connection cables and transformers, enabling clients to reach the correct voltage. Power Electrics also provides a wide range


of High Voltage (HV) transformers suitable to bespoke requirements of projects ranging from 2MW to 100MW.


High voltage generator transformers range


in size up to 4000kVA and are able to operate at either 50Hz or 60Hz to match the system requirements. In August 2017 Power Electrics supplied


two 1250kVA generators to power a key sub- sea cable installation equipment for a global submarine communications company. Submarine cables like these are laid down by using specially modified ships - sometimes even purpose-built ships - which carry the submarine cable onboard and slowly lay it out on the seabed as per the charts/plans given by the cable operator. The ships can carry with them up to 2,000


kilometers length of cable. Depending on the equipment onboard the cable-ship, the type of plough used, the sea conditions and the


“The success of this project can be


attributed to excellent project


management and the


engineering. We’re always happy to take on unique challenges which require purpose­ built solutions.”


­ Lee Sharp, Regional Sales


Manager, Power Electrics


JANUARY ‐ FEBRUARY 2018 UK POWER NEWS


ocean-bed where the cable is being laid-down, cable ships can do anywhere from 100-150km of cable laying per day. Newer ships and ploughs now do about 200 km of cable laying per day. The generators supplied by Power Electrics


were designed to provide power for the motor reels which are used to lay the cable and were specifically set to work in ‘Runner–Standby’ configuration, meaning that power would not be lost in the event of a fault with one of the generators. Bespoke service packs were also provided


to the company to enable regular onboard maintenance. The generators were loaded on to an offshore vessel using dock cranes. Regional Sales Manager, Lee Sharp, commented on the project: “The success of this project can be attributed to excellent pro- ject management and the engineering which went into manufacturing the bespoke generator units. We’re always happy to take on unique challenges which require purpose- built solutions.” www.powerelectrics.com


31


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40