search.noResults

search.searching

note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
4


NEWS


Managing Editor James Parker james@netmagmedia.eu


Advertisement Manager/ Joint Publisher Anthony Parker anthony@netmagmedia.eu


Production Assistants Mikey Pooley Shelley Collyer Carmen Simpson


Assistant Editor Teodora Lyubomirova


Editorial Assistants Roseanne Field Jack Wooler


Editorial Coordinator Sue Benson


Contributors Ray Philpott Mark Smulian Jess Unwin


Sales Director Lesley Mayo


Sales Executives Suzanne Easter Ian Fletcher Kim Friend Steve Smith


Audience Development Man- ager Jane Spice


Managing Director Simon Reed


netMAG media


publishing – ver tical search


netMAGmedia Ltd Cointronic House Station Road, Heathfield East Sussex, TN21 8DF


Advertising & Administration t 01435 863500 f 01435 863897 info@netmagmedia.eu www.architectsdatafile.co.uk


Press Releases editorial@net-


FROM THE EDITOR


schemes emerged in 2005. L


However as with the similarly PFI-funded hospital building boom of the late 1990s and early 2000s, there was a great deal of controversy around whether the wham-bam approach to delivering schools quick was both able to and did indeed generally deliver the required quality for good learning environments.


Some of the demolition decisions seemed more brutal to many than the allegedly brutal buildings they were removing, such as Pimlico School in London. And their replacements were not universally hailed as a success to say the least, such Pimlico’s replacement, which was criticised by the Government’s design watchdog CABE. And although Scotland did not fall under BSF, there was a ‘damning’ report in 2016 on 17 PFI schools built in Edinburgh which were claimed to have serious safety-critical design flaws.


Perhaps the issues resulting from PFI and the standardisation attempts made in BSF were what led Michael Gove to can the programme in 2010 and replace it with a combination of the Priority Schools Building Programme, or maybe it was the start of austerity. Essentially PSBP is a repair and renewal programme for the most dilapidated schools, and the separate Academies and Free Schools programmes. The new scheme offered hope to around 150 projects were left in limbo following the ending of BSF, including promises of getting off the ground in far less time than BSF equivalents. In total 277 projects are planned to complete before 2021.


magmedia.eu Annual subscription costs just £48 for 12 issues, including post and packing. Phone 01435 863500 for details. Individual copies of the publication are available at £5 each inc p & p. All rights reserved


No part of this publication may be reproduced or transmitted in any form or by any means, electronic, mechanical, including photocopying, recording or stored in any information retrieval system without the express prior written consent of the publisher. Although every effort is made to ensure the accuracy and reliability of material published in Architects Datafile, the publisher can accept no responsibility for the claims or opinions made by contributors, manufacturers or advertisers. Editorial contributors to this journal may have made a payment towards the reproduction costs of material used to illustrate their products. The manufacturer of the paper used within our publication is a Chain-of- Custody certified supplier operating within environmental systems certified to both ISO 14001 and EMAS in order to ensure sustainable production. Printed in England


While the PSBP covers a wide range of repair and rebuilding projects in England, Wales took the bull by the horns and introduced Schools Challenge Cymru, whose funding ended in 2016 but in three years targeted 40 schools for improvement. One of these was a new school, Bro Dinewfr, in picturesque Camarthenshire (which we feature on page 26 of this special supplement). However despite its attractive, eco-friendly design, the fact that it was created to replace two schools (one of which was 12 miles away), illustrates the funding challenges and the resultant local opposition the architects had to counter.


And kids of course face their own set of challenges. Now confronting formal SATS tests at age 11, on top of the perennial pressures to cope with in school, the minimum our kids deserve is that scrutiny and care is paid to the quality of the environments that underpin their learning. Beyond mere cliches of ‘investing in the future’, it’s simply a basic requirement of a civilised society to provide education in a way that is harmonious and supportive. Buildings are a fundamental part of this, from daylight to acoustics but also build quality and aesthetics, and this supplement celebrates several good examples.


James Parker Editor


BUILDING FOR EDUCATION & STUDENT ACCOMMODATION


adf 06.17


ON THE COVER... VERDE STUDENT ACCOMMODATION NEWCASTLE Verde is an unashamedly attention-grabbing, show- stopper of a building. Clad in reflective, chromatic green ceramic tiles, the front of the striking structure resembles the prow of large ship. For more information, go to page 20. © Daniel Hopkinson


evers for investment in the education sector are not what they used to be. Recognising the sorry state of a lot of England’s education estate, and its resultant damaging effect on pupils’ chances, the Government launched the Building Schools for the Future (BSF) programme, whose first wave of


WWW.ARCHITECTSDATAFILE.CO.UK


ADF JUNE 2017


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52