CABLE PROTECTION


CABLE PROTECTION SYSTEMS AND THEIR IMPORTANCE FOR OFFSHORE INSTALLATIONS


Cable Protection systems may only be a small portion of the CAPEX of an Offshore Wind Farm. However, it provides a critical element in ensuring the reliability of all important cable which transmits the generated power back to land.


BPP CABLES AND TEKMAR COLLABORATION BPP Cables have supported Tekmar, a leading manufacturer of cable protection systems for a number of years, by providing reliable engineering analysis on their market-leading Teklink system. This value-adding verification provides reassurance to clients – usually developers and installation contractors – that the cable protection solution selected will provide reliable service for the expected life of the wind farm.


CONSIDERATIONS Amongst the many factors to be considered when selecting a cable protection system are the existing environment and the potential changes over time, such as scour. Vibration and the inevitable marine growth also need to be considered. It is common within a windfarm array for there to be considerable variation of operating depths and a “one-size-fits-all” product is rarely the answer.


EXPERIENCE


With an extensive track record of manufacturing and installing cable protection systems, Tekmar is ideally placed to build on their success and have an investment R&D programme lead the market in product innovation.


BPP Cables, a subsidiary of BPP-TECH, a long-established energy sector engineering consultancy, provides high quality support to cables-related engineering. This ranges from our proprietary HV dynamic cable designs, through analysis and product development, to forensic analysis. Through the close working relationship between BPP Cables and Tekmar the team understands the technical requirements of the developers and full range of challenges new projects serve up.


COMBINED STRENGTHS The cooperation draws from the combined strengths to deliver a well-designed, quality manufactured and executed CPS – is of greater value than the sum of the parts.


Clients are better informed of the challenges that cables face when installed offshore and the value of well designed cable protection systems. This often means cable protection engineers are engaged at an early stage to address the specific areas of risk.


Through strong collaboration, BPP Cables and Tekmar are well placed to address the major industry concerns, with practical engineering analysis e.g. cable vibration in a monopile. This pioneering analysis by BPP Cables almost two years ago enabled specific vibration studies for a number of clients, all of whom have benefited from the results – based upon very robust methodologies – which BPP Cables delivered.


96 www.windenergynetwork.co.uk


JOINED-UP THINKING The offshore wind supply chain is still relatively immature but by working closer, with joined-up thinking, will assist in reducing costs and the industry becoming more competitive. The criticality of cables and their integrity has often been underestimated, but recently there appears to be a growing desire to engineer out-risk at an early stage in the life cycle of projects.


BPP Cables


Click to view more info = Click to view video


Tekmar


FEATURE SPONSOR


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116