This page contains a Flash digital edition of a book.
Pitchcare Classifieds SPORTS TURF CONTRACTORS


• Supplies


• Renovation • Drainage


• Construction 01797 252299


www.bourneamenity.co.uk enquiries@bourneamenity.co.uk


CH GROUNDS MAINTENANCE LTD


DRAINAGE


Piped Drainage, Sand Slitting, SandMaster CONSTRUCTION


Sports Fields and Golf Courses RENOVATION


Verti-draining, GroundBreaker, Over-seeding Top-dressing, Koro Field Topmaker


Tel: 01494 758208 info@chgrounds.com www.chgrounds.com


Slitting  Banding  Maintenance


Tel 01772 877289 (Preston, Lancs) Email: info@dixondrainage.co.uk www.dixondrainage.co.uk


  


 


Established golf greens can be drained at a fraction of the cost of rebuilding them, and with none of the upheaval


Sports Ground Contractors Ltd 


 


 


 


David Shelton suggests that choosing the right option to finance your drainage requirements, working when the weather is favourable, and selecting the correct machinery, can help cut costs


D W Clark DRAINAGE LTD


SPECIALIST SPORTSTURF CONSTRUCTION & DRAINAGE CONTRACTORS • Gravel Banding • Sand Slitting


• Top Dressing • Renovation • Irrigation Unit 7, Brailes Industrial Estate, Winderton Lane, Lower Brailes Banbury, Oxfordshire OX15 5JW


Tel: 01608 685800 Fax: 01608 685801 email: jim@dwclarkdrainageltd.co.uk Web: www.dwclarkdrainageltd.co.uk


land drainage - and this is unwise, for drainage problems rapidly compound themselves. So, if finance is tight, but drainage is essential, how can the two be reconciled?


W


The answer is relatively simple - work in the most efficient and effective manner. How? One needs to use today’s high output sports turf drainage machines in optimum soil conditions. This entails planning ahead and stressing to the senior management that soil conditions, and not the calendar, must determine when work is undertaken. A trenching machine, for example, working in the late spring, summer or early autumn may have an output per day double or even treble that of the same machine working in wet soils in winter. And, seeing that there will be provision for supporting equipment, and of the order of five operators on site, savings are substantial. The subject of trenching leads on to pipe size - one tends to think that bigger must be better, but this is not so. In removing excess soil water, fine particles enter the pipe. There must be a good flow of water through the pipes to carry these ‘fines’ away. Too big a pipe and the flow of water is sluggish and ‘fines’ build up, in effect reducing the


138 PC DECEMBER/JANUARY 2012


hen times are hard, one activity that often gets put aside is attention to


size of the pipe.


For optimum results, the pipes should fit snugly in the trenches; for example an 80mm pipe would fit into a trench cut 97mm wide.


The latent force in the soil reduces the trench width almost immediately it has been excavated.


In turn, this degree of


precision leads to savings in the backfilling aggregates. Placing gravels and sands in narrow trenches, without contaminating the surface, has been one of the slowest parts of the drainage activity. But now, there are machines, such as the Fast-Flow range of backfilling hoppers, that enables placement of these materials at speeds of 5-6 mph. Minimum disruption to the playing surface must be a high priority, for it is costly to undertake repairs, re-turfing and collecting spilled soil. This entails using modern, dedicated sportsturf drainage machinery, rather than something cheap and cheerful, or even doing it by hand.


Secondary drainage schemes are usually superimposed over the primary piped system to enhance the speed of drainage. For years, sand slitting was the only option. 50mm wide trenches were dug 250-300mm deep, then backfilled with gravel and topped with sand or rootzone.


These slits worked well, but


Vertidraining, Hollow Coring, Overseeding, Draining, Gravel Banding, Field Top Maker, Deep Scarifying


Mobile: 07860 259692


Tel: 01284 735105 Email: peter@buryturfcare.com www.buryturfcare.com


Philip Dixon Contractors Ltd Established 1978


Sportsturf Drainage Specialist Drainage  Construction  Renovation


Drainage


Hard times? Need drainage? Cut costs, don’t cut corners


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132  |  Page 133  |  Page 134  |  Page 135  |  Page 136  |  Page 137  |  Page 138  |  Page 139  |  Page 140  |  Page 141  |  Page 142  |  Page 143  |  Page 144  |  Page 145  |  Page 146  |  Page 147  |  Page 148