Rapid Prototyping Cuts Lead Times for Investment Casting s
Cast Component: Double suction impeller. Material: Martensitic stainless steel. Process: Investment casting.
Application: Heavy-duty single-stage pump.
Casting Supplier: Tech Cast LLC, Myerstown, Pa. Casting Customer: SPX, Charlotte, N.C.
• T e casting supplier used 3D drawings and stereolithography rapid prototype technology to cut lead time in half, from 12 weeks to six.
• Compared to those produced via green sand, the investment cast- ings reduced machining, welding, and grinding requirements for the 500-lb. impeller.
• T e impellers, measuring 30 in. in diameter, were extensively tested and found to be defect free.
Jan/Feb 2015 | METAL CASTING DESIGN & PURCHASING | 15
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60