89.


Surveillance sightings of UK vessels identified by method are given in Figure 14.34.


The principal gear types8 employed by UK registered vessels within the vicinity of the proposed East Anglia THREE project are as follows:


     


14.5.10.1 90.


Potting; Gillnetting; Beam trawling;


Demersal trawling; Longlining; and Driftnetting. Potting9


Potting is undertaken by local vessels within the vicinity of the offshore cable


corridor. Figure 14.35 shows the distribution of landings values of shellfish pot fisheries around the UK. On a national scale, crab and lobster landings from the vicinity of the offshore cable corridor (33F1 and 33F2) are low. However, these landings are important to local vessels when landed in addition to fish species targeted with other methods. Similarly, it should be noted that whilst whelk landings from the vicinity of the proposed East Anglia THREE project are very low in a national context, they have shown an increase in recent years.


14.5.10.2 91.


Netting The distribution of landings values from UK vessels deploying driftnets, gillnets and


trammel nets are shown in Figure 14.36 to Figure 14.38, respectively. In all cases, landings recorded in the vicinity of the proposed East Anglia THREE project are dominated by sole and are of lower value than areas such as the south-east coast and English Channel. Lower values of herring and other species are recorded immediately west of the proposed East Anglia THREE project. In the south-east and English Channel, either sole or bass represent the highest value landings for all three


8 Note that although scallop dredgers have been recorded during surveillance operations these are likely to be vessels steaming to and from ports outside East Anglia to grounds located in the English Channel. At the time of writing there are no known scallop grounds in the vicinity of the proposed East Anglia THREE project.


9 Potting is a static gear comprised of a mainline holding between six to 25 pots spaced at intervals between 10 and 20m (e.g. 60 to 440m total length) depending on vessel size and the area fished. Further information on gear specification and operational practices are provided in the Technical Appendix.


Preliminary Environmental Information May 2014


East Anglia THREE Offshore Windfarm


Chapter 14 Commercial Fisheries Page 49


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132  |  Page 133  |  Page 134  |  Page 135  |  Page 136  |  Page 137  |  Page 138  |  Page 139  |  Page 140  |  Page 141  |  Page 142  |  Page 143  |  Page 144  |  Page 145  |  Page 146  |  Page 147