This page contains a Flash digital edition of a book.
WINTER MAINTENANCE


GROUND CONTROL TO FACILITIES MANAGER: AVOID A WINTER OF DISCONTENT


We hear from Andy Simpson, Ground Control’s Winter Maintenance Operations Manager about how to prevent the onset of the winter blues in your facility, by being prepared, whatever the weather.


Winter maintenance not only has a huge impact on companies’ sites, it also affects staff, customers and the surrounding communities. With slip, trip and fall claims on the rise following the increase of the ‘no win no fee’ culture, the issue of planning around the winter weather should surely be high on all companies’ lists of musts, not only to reduce the possibility of being sued, but also as a matter of simple health and safety.


However, despite the threat of record breaking bad weather this year, many organisations it appears are not giving their winter planning any forethought; that is until the inevitable frost comes and affects everyone’s journeys to work.


Although the actual operation of spreading salt on the ground is reasonably straightforward, winter maintenance overall is extremely complex. Customers often don’t give a thought to weather trigger points and potential access issues; gritting operations are usually carried out overnight and therefore may require keys or specialist inductions as well as health and safety requirements. Consideration must also be given to the surrounding area in terms of the roads leading into the company, the car parks and the variety of working areas including access footpaths, walkways and loading yards.


In other words, winter maintenance requires planning. For example, does


60 | TOMORROW’S FM


the company’s external footprint require gritting over the weekend? Where should the snow be piled once ploughed? Will the surrounding roads need gritting? Is there a need for frequent gritting, and if there is, what are the best times to do it? All in, there are numerous permutations, all requiring a plan to be devised around in order that business can be carried out as close to normal as is possible and crucially, without interruption or downtime.


“NOT ONLY IS A


‘REACTIVE ONLY’ SERVICE UNWISE, BUT IT IS ALSO NOT COST-EFFECTIVE.”


The type of winter service required must additionally be thought about long before the thermostat is cranked up or the winter woollies come out. We get asked every year if we can provide a ‘reactive only’ snow clearance service, which we can only assume is because the winter plan hasn’t even been considered. Not only is a ‘reactive only’ service an unwise option, but it is also not as cost-effective as it seems at first glance. During the winter months, gritting and other winter maintenance services are required throughout the period; not just once. This means that planning is required by organisations such as Ground Control in order to match the amount of labour, plant and


machinery needed with the demand.


If a customer chooses the reactive only service, that customer is in danger of losing out to those that have planned ahead. After all, winter maintenance providers will service sites that have a proactive agreement in place first, due to the ability to be able to think ahead. Salt can be taken to locations close to customers’ sites ahead of time; conversations will have been completed around what will need clearing and where any snow should be placed; a site recce can have been completed, if required, to work out in advance what needs to happen and at what time the gritting should take place to cause the least disruption. For those with a reactive service, none of this can happen meaning these companies will be at risk of causing disruption to their own staff and customers, with the obvious potential knock on effect on the company’s finances.


In conclusion, my recommendation to any organisation is that they treat winter maintenance like any other business need; they plan ahead for it. The winter months are just around the corner, and if they aren’t planned for, the risks could be at best problematic, and at worst catastrophic if customers can’t access the premises. Don’t be a reactive; be proactive to avoid a potential winter of discontent.


www.ground-control.co.uk twitter.com/TomorrowsFM


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74