ROOFING 49


Kemper System provides roof terrace and balcony solution at Millbrook Park


private and social housing at ‘The Mount’; part of the 2,174 unit, multi-developer Millbrook Park scheme in the London Borough of Barnet. Comprising a mix of eight four-storey


K


apartment blocks and four blocks of three- storey town houses, the landmark scheme is part of a major regeneration project to create a new community in Mill Hill, which includes a new primary school and almost six hectares of green space. Kemper System’s Kemperol V210 membrane has been used as part of a brown roof build up on the apartment blocks, which also include a solar PV installation on the roof. It has also been used as the waterproofing membrane on the town house balconies. Specialist contractor, Cawston Roofing was


responsible for delivering the roofing scheme, applying Kemper System’s Kempertec EP5 Primer to the concrete substrate before installing the Kemperol V210 membrane in a single wet-on-wet process. The cold-applied resin was rollered onto the roof and Kemper


emper System’s Kemperol V210 cold- applied liquid waterproofing membrane has been used to complete a mix of


The inverted roof build up included


installation of a double thickness of 180mm XPS (extruded polystyrene) insulation board onto the cured membrane, followed by a slimline deflection membrane and paving slabs to provide the base for the solar PV panels. The brown roof was then installed around the perimeter of each block. The same inverted system was used for the


apartments’ terraces, with a lighter insulation. On the townhouse balconies, the Kemperol V210 was applied to the ply substrate, using the same wet-on-wet resin-fleece-resin process, as there was no requirement for insulation. Comments Kevin Cawston from Cawston


Roofing: “The Kemperol V210 system was ideal for this project as it was suitable for use across the roof, terrace and balcony areas. With excellent root resistance it addressed the needs of the brown roof specification and the inverted roof build up enabled trades to begin the interior fit out while work continued on the roof.”


System’s 165g flexible reinforcement fleece was laid onto the wet resin, followed by more resin to ensure complete saturation prior to curing.


01925 445532 www.kempersystem.co.uk


155


WWW.HBDONLINE.CO.UK


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60