MARINE CONSULTANCY


PROJECT DETAIL


A series of lifting beams were required including a modular system for bolting to the circa 90 Te hub. The remit for a lifting attachment that could…


• Be bolted directly to the casting • Allow for lifting and rotation through 90 degrees for transportation


• Allow for lifting and accurate alignment to shaft line for final installation


• Designed to DNV offshore lifting regulations and standards


OTHER RELEVANT REQUIREMENTS In addition to the hub lifting equipment the company also designed, fabricated and load tested the lifting beam and rigging spread for the Nacelle lift. Here, highly eccentric cog conditions made for a challenging design case with over 80% of the nacelle’s circa 450 Te weight being carried through one end of the lifting beam only.


Malin Marine Consultants, part of the Malin Group comprise a team of professional, multi-disciplinary engineers providing a diverse and flexible set of specialised skills. These are built on a wealth of practical experience gained through working transportation and heavy lift projects both in the office and supervising on site.


RECENT CONTRACT


Recently they were contracted to design and fabricate a series of lifting beams for Mitsubishi Heavy Industries to assist with the installation of their prototype Sea Angel turbine at an environmentally sensitive test site in Hunterston, Scotland.


ADDITIONAL RESPONSIBILITIES When on site, MMC were then asked to attend and oversee the assembly and use of the lifting equipment as well as carry out third party reviews on the lifting and logistics operations on behalf of the site lease owners, SSE.


This included advice on mooring arrangements, review of lifting and handling procedures and liaison with the local port authority on acceptable marine operations within the local environmentally sensitive site.


Malin Marine Consultants


www.windenergynetwork.co.uk


97


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100