NOTICE TO SUBCONTRACTOR BIDDERS PREQUALIFICATION REQUEST HIGH POINT CENTRAL HIGH SCHOOL


MEDIA CENTER ADDITION / CAFETERIA EXPANSION & RENOVATIONS


** ALL PACKAGES**


Rentenbach – Nesmith, a joint venture, (Construction Manager at Risk) is seeking to prequalify subcontractors to submit bids for the furnishing of labor, material and equipment for the Media Center Addition and Cafeteria Expansion & Renovations at High Point Central High School in High Point, NC.


The project value is approximately $8,000,000. Work of the Project includes construction and renovation of the following: 1. 2. 3. 4. 5. 6. 7.


Interior renovations to convert the former Electronic Lab into the Culinary Lab and Classroom. Replacement of the roof above the existing Auditorium and all interior Auditorium renovations. Interior renovations of the existing Men’s and Women’s toilets. New parking lot and miscellaneous site improvements.


Rentenbach-Nesmith, along with Guilford County Schools, encourage and support the use of Minority & Woman-Owned Businesses as both first and second tier bidders.


Tentative Bid Date is September 10, 2015


Trade subcontractors are required to be prequalified for the Bid Packages below. Payment and Performance Bonds will be required for Trade Packages over $250,000 (see Prequal document for package values). Please note that Bid Packages over $100,000 will re- quire a Bid Bond.


Bond


Bid Package 01


02 05 06 07 08 10 11 12 13 14


14A 18


20


20A 21


21A 22 23 24 25


Required Yes


Yes No No No No


Yes Yes Yes No


Yes Yes No


No No


Yes No No No No No


Scope of Work


Interior & Exterior Demolition Site Grading & Site Utilities Site Concrete, Curbs & Paving Asphalt Paving


Fencing & Barricades Landscaping


Structural Concrete


Masonry, Stone & Precast Structural Steel


Waterproofing / Dampproofing Roofing


Specialty Roofing (Slate Only)


Glass/Glazing & Aluminum Entrances


Hollow Metal, Doors, Hardware (Furnish & Install) Millwork/Casework Drywall / Plaster Acoustical Ceilings


Ceramic, Quarry, Terrazzo Carpet & Resilient Painting


General Trades (Toilet Accessories, Wall Protection, Lockers, Marker/Tack Boards, Fire


32A 32B


32E


out 32F


(Furnish & Install) 32G


32H 33


No No


No No No


Yes No


26 27


27A 27C 28


28A 29 31


32 No


Yes Yes No


Yes Yes Yes No


No


Protection Specialties) (Furnish & Install) Fire Protection HVAC


Plumbing


Test, Adjust & Balance Contractor Electrical


Low Voltage Systems Food Service Equipment


Equipment / Special Construction (W/D, Appliances)


General Works – General Labor for Daily Clean, Traffic Control, Misc Carpentry, Safety, Etc. General Works – Final Clean


General Works – Office Trailer Rental & Set Up, Furnish, Set-Up & Maintain Temp Toilets, Office Trailer Monthly Cleaning


General Works – Surveying, Lay- Scaffolding & Exterior Signage


General Works – Interior & Exterior Signage (Furnish & Install)


Hazardous Materials Removal Spray Fireproofing


Prequalification Workshop and Contractor Outreach Meeting will be held on Tuesday, July 14, 2015 from 4:00 – 6:00 PM at High Point Central High School Auditorium, 801 Ferndale Blvd, High Point, NC.


Submittal of completed prequalification forms is due to Rentenbach-Nesmith no later than July 28, 2015. Prequalification documents can be accessed through the following link: http://www.christmanco.com/docs/HPCHS_Prequal_Docu- ments.PDF


If you have any questions, please contact Kim Neese at kim.neese@rentenbach.com or Patsy Matthews at patsy.matthews@rentenbach.com.


Construction of a one story Cafeteria addition to the southwest wing of the existing High Point Central High building. Additions and interior renovations to convert the former Cafeteria into a Media Center. Interior renovations to convert the former Media Center into Classrooms.