Pitchcare Classifieds WEED CONTROL
Tailormade weed control programmes
• Single application • Contract spraying • Any size area, any situation
Why not visit our online Buyers Guide for direct links to suppliers websites and email addresses
We also offer a complete maintenance and renovation programme for amateur and professional football and rugby clubs, racecourses and golf courses.
01744 885098
Mobile: 07711 004000 Email:
info@rainford.com www.rainford.eu
What you need to know for the new season:
Please see below the main CEN Goal Post Standard requirements and Safety tips that will help to reduce risks of injury to the public;
• All equipment must be checked before it is used to ensure it is safe and has not been tampered with or vandalised - especially if a pitch is accessible when unsupervised
• If a goal is found to be damaged or faults are found during an inspection, the goal should be withdrawn from service until the defect is made good
• All repairs must be completed using only the correct parts supplied by the original manufacturer/supplier as stated in the products instructions. No repair should be made that changes the structural integrity, design or shape of the goal
• It is essential that anchors be fitted to all freestanding goals, in use and when stored, irrespective of size; however, this does not apply to self- weighted goals
• If a goal is stored against a wall or fence, it must be securely attached by anchors or fence anchor chains so it cannot fall over
• All socket type goals should be concreted into the ground and caps placed over sockets when goals are removed or not in use. Goalpost sockets should always be set in concrete, as per the manufacturer’s instructions
• The uses of Steel Cup Net Hooks were banned by the FA back in 2007 and is a rule that must be adhered to
We would strongly recommend that you check that any goals you wish to purchase comply with the relevant standard for the industry. If you would like to read more about goalpost safety, then please go to our website
www.harrod.uk.com where a copy of our full Goal Post Safety document can be downloaded.
WATER MANAGEMENT
www.pitchcare.com
VACANT POSITIONS
PC AUGUST/SEPTEMBER 2014 I 159
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100 |
Page 101 |
Page 102 |
Page 103 |
Page 104 |
Page 105 |
Page 106 |
Page 107 |
Page 108 |
Page 109 |
Page 110 |
Page 111 |
Page 112 |
Page 113 |
Page 114 |
Page 115 |
Page 116 |
Page 117 |
Page 118 |
Page 119 |
Page 120 |
Page 121 |
Page 122 |
Page 123 |
Page 124 |
Page 125 |
Page 126 |
Page 127 |
Page 128 |
Page 129 |
Page 130 |
Page 131 |
Page 132 |
Page 133 |
Page 134 |
Page 135 |
Page 136 |
Page 137 |
Page 138 |
Page 139 |
Page 140 |
Page 141 |
Page 142 |
Page 143 |
Page 144 |
Page 145 |
Page 146 |
Page 147 |
Page 148 |
Page 149 |
Page 150 |
Page 151 |
Page 152 |
Page 153 |
Page 154 |
Page 155 |
Page 156 |
Page 157 |
Page 158 |
Page 159 |
Page 160 |
Page 161 |
Page 162 |
Page 163 |
Page 164