This page contains a Flash digital edition of a book.
Golf


“We need to understand the varying levels of success at our respective golf venues and be ready to help determine a solution”


with additional resources to purchase sands and aggregates to maintain these important processes. As indicated, this area of the country


endures significant amounts of annual rainfall. Statistically, over the past three years, the annual rainfall recorded was: 2010 - 1191mm 2011 - 2174mm 2012 - 1776mm With these amounts of annual rainfall, some of the challenges we face are poor golf course presentation, flooding, erosion, golf course closures and the potential for a negative reputation. Our challenges were obvious and, with these in mind, a strategy was agreed. The investment in the aforementioned equipment was secured and the management and subsequent improvements are now clear to see. We do not have any temporary greens, only temporary surfaces on par 3 tees. We have a practice facility which includes the use of floating golf balls; we have a large lagoon in the middle of the facility which includes a floating green!


Additional to golf facilities, we also offer guided walks around the nature reserves, manage a fishing syndicate, offer tennis, guided hill climbing walks, a Loch cruise and sea plane excursions. Other than mowing practices, we aerate and topdress our greens at least monthly, aiming to apply circa 200 tonnes of sand to the greens which, in the wet environment, is no mean feat. Aeration consists of 5 and 8mm solid tining, 12mm hollow tining, sand injection Graden scarifying, 8 and 12mm verti-draining, slit tining and brushing. We apply foliar feeds to tees and


greens throughout the summer - tank mixed with Primo Maxx PGR - granular feeds throughout winter and generally aim for around 200kg of N per hectare - this is dependent on rainfall and aeration which can increase/decrease inputs. Fairways receive approximately 20kg of N per hectare; however, we apply soluble iron to improve presentation. Our approach to mowing and maintenance is to share roles and responsibilities to avoid repetition,


however, there are a small number of specialist tasks which are undertaken by specifically trained staff. Golf course presentation and turf quality is paramount to what we are trying to achieve.


End of season maintenance on greens is 12mm hollow tining and Graden sand injection scarifying. There are no budget constraints. We communicate all the work we are doing and the latest developments to the golfing public via a monthly newsletter. As for projects, it could be considered that drainage improvements are project work, however, as we are constantly maintaining and upgrading the drainage at the Carrick, we see this as general maintenance. Recent projects (within the past 18 months) have included a complete 122 bunker refurbishment, which included the re-turfing of all the faces, with additional tee construction and, on the 14th hole, additional secondary drainage, which was undertaken by a contractor.


14 PC JUNE/JULY 2013


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132  |  Page 133  |  Page 134  |  Page 135  |  Page 136  |  Page 137  |  Page 138  |  Page 139  |  Page 140  |  Page 141  |  Page 142  |  Page 143  |  Page 144  |  Page 145  |  Page 146  |  Page 147  |  Page 148