9 KEY STAGES


There are 9 key stages to considering getting your project from inception to fruition.


1 Wind Assessments – wind assessments are often needed to get sound financial backing and to get the warranties on power curve. The time taken to do these has reduced to about 5 weeks with a virtual study


2 Planning Consent – a well-prepared submission will minimise potential delays


3 Grid Connection offer – this can take 3 months and could still give a connection date after the FIT deadline has passed as grid capacities vary across the UK.


4 FIT Pre-Accreditation – can be registered if you have secured planning consent and a grid connection for your site by the December 2013 deadline.


5 Finances – sound financial backing is paramount and, if using a bank, this can take some months to approve. Sign the wind turbine contract and pay the booking fee. Turbines can take from 4 months to 18 months to be delivered, which could affect the FIT deadline.


6 Discharge planning conditions – this can take 3 months.


7 Turbine build – this takes on average 10 to 12 weeks for a medium wind turbine. This includes turbine installation, electrical contractor, civil contractors, turbine installations, DNo works, turbine commissioning and is subject to key components being available such as transformers and DNo response times.


8 Commission your turbine – secure your FIt Rate before April 2014 if you haven’t got an approved pre-accreditation.


9 Making the most out of the FIT – make sure that you have good warranties, contracted operational figures, and an operation and maintenance contract to ensure you have well serviced, well looked after turbines generating the contracted performance figures.


over the last 18 months ICE Renewables has installed and now operates and maintains 3.1MW of turbines and can offer support on your wind turbine project.


ICE Renewables


www.icerenewables.com Click to view more info


www.windenergynetwork.co.uk


95


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116