“The most wear is from Tykes games”


training surfaces for them with the resources available. Understanding their requirements is essential. Players traction needs are very different. There’s a saying about footwear for grass sports - football is played on the top of the surface, rugby league on the top and below and rugby union is always below.


I have found this to be true, we see the most wear resulting from the Tykes matches. Every ball is contested, with two and more players going into contact, resulting in several pairs of feet tying to maximize grip on the turf. The worst damage is from scrums, especially late on in the game when players are tired. Several scrums can take place on the same spot.


MY biggest challenge is, without doubt, pitch renovation - when to fit some in. We do not have the time to undertake major reinstatement works such as fraise mowing or re-turfing. We are left with trying to fit in scaled down renovations, usually in July.


This year we will start on July 18th with a programme of scarifying in several directions, aerating with our own verti drain, topdressing with 60 Tonnes of Mansfield 70/30 rootzone and oversowing with Barenbrug BAR 7, which we have used now for a number of seasons. We do not use any fescue grasses because we do not get enough high soil temperatures up here in Leeds for adequate germination, and the fact that our sports will soon kick it out. We are gradually trying to improve the pitch’s ability to drain more quickly. Last year we were able to complete 1/3 of the pitch, putting in a series of sand bands at 1 metre centres, and will be completing


the rest of the pitch this year. We have decommissioned our old under soil heating system that was laid way back in the 1960’s. The recent milder winters have meant we have not needed to use it, plus we have purchased a complete set of frost sheets to use if necessary.


In fact, the under soil heating had caused us a few problems. It had formed a soil pan at 100mm, which, in turn, affected the drainage capabilities of the pitch. We have now broken through this pan with a programme of aeration works and the sand bands.


OUR fertilizer regime consists of applying a 20-10-10 (16 bags) in late March or early April, followed up with a 6-9-6 (8 bags) in May, and then looking to put on something like a 12-0-9 plus iron (22 bags) in June, keeping the phosphate levels down as we have plenty available in our existing soil profile. Summer also has its problems when we have cars parked on our pitch during county cricket matches. Fluid from the air conditioning systems give me the most grief, there seems to an oily residue that stains the pitch. Once the car parking is completed we de-compact, brush and fertilise to encourage the grass to recover. Vertidraining is high on our agenda, we operate a weekly programme to keep the pitch open. I am a great believer in the basics - feeding, aerating and mowing. I tend to vary what I do depending on the weather and based on my gut feelings. So far, it has always stood in me in good stead. Throughout the winter playing season we maintain a cutting height of 45mm in the stadium, mowing with two 36" Mastiff mowers, presenting bands at 2.5m and 5 m widths. In the summer months I


reduce the height of cut to 35mm to encourage some tillering of the sward. It is during the periods of June and July that I want to maximise the recovery of the pitch with a combination of oversowing, watering and feeding to achieve maximum growth. Having a fully operation Rainbird watering system certainly helps me achieve these objectives. I like having wide, bright pitch lines between 125mm and 150mm. We mark out our pitches using a specially designed spray jet marker. It has two spray jets instead of one so that both sides of the grass leaf blade get coated with marking fluid. The machine also has larger diameter disc plates fitted, enabling me to follow the string line more easily when going over pitch undulations.


The training pitches are used from 2 to 4 hrs per day, every day. We try to replicate the maintenance regime we operate at the stadium to produce a consistent surface for the players. My aim is to continually improve the pitches at the stadium and training ground. With regard to the stadium we still have a few problems with black layer and undulations. The installation of a fibre sand system or similar reinforced pitch system would help reduce the wear and, at the same time, give me the opportunity to restore the playing levels and improve drainage rates. Here at Leeds I believe I have one of the most rewarding jobs in the country. The management support me 100% in most situations, and we are always looking to improve the quality of our facilities. We feel we play our part in bringing success to both the Rhinos and Tykes.


MACHINERY LIST Main Ground:


Above: The training ground is used 2-4 hours each day. Right:


Headingley Stadium looking all prim and proper


20


2 x 36” Ransomes Mastiffs 1 Kubota 7200 tractor Huxley Scarifier Sisis Variseeder Weidennmann Terraspike Coremaster Aerator Wessex Sweeper Auburn mowing deck Wessex tractor mounted rake,roller, and brush Pedestrian Scarifier


Pedestrian Aerator Allman Sprayking Allen Hover Mower McCulloch Strimmer Linemark electric marking machine


Training Ground:


1 x 36” Ransomes Mastiff 1 x Ransomes


Commander (5 gang) Ransomes 3 gang unit Transfer wheel marking machine Kombi electric sprayer Mobile Irrigation unit Yanmar Compact Tractor


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52