This page contains a Flash digital edition of a book.
PRODUCTION • PROCESSING • HANDLING


QUALITY GUARANTEED Within the rigorous quality assurance processes, all of the MIG and TIG welds undertaken are subject to visual inspections, radiographic and ultrasound scanning as well as hardness testing; with all such results being entered in the Manufacturing Record Book (MRB) for each skid. In addition, the project flow meters


were sourced from Litre Meter and the pressure sensors from ABB. Much of the instrumentation is hard-wired back to the FPSO’s control room, enabling the operations team to identify any supply problems and address them without delay. Te packages have been fully engineered to meet all applicable EC directives, including ATEX and PED, all client specifications and to conform to the DNV Class requirements. Due to the meticulous design work and painstaking assembly processes employed at every stage of its contract, Tyco is fully confident that when COSCO finally secures the FPSO on station in the Western Isles fields, the chemical and methanol package will perform its duties safely and reliably throughout its 20-year design life. l


Level Measurement


 Meets the design standard of the oil & gas, petrochemical, hydrocarbon and LPG/LNG industries: – Fully ANSI/ASME design – Includes NACE requirements


 Reliable level indication without external power with three functions in one device: – Liquid level indication – Liquid level switch – Liquid level transmitter


 Equipment with optional bi-stable change over or on/off switches and linear or non linear transmitters (also as 2-wire systems with 4…20 mA output, optional with HART®


)  CE-conform and Ex-approval


 For operating pressures from vacuum up to 400 bar and higher, operating temperature from –196 °C up to +400 °C


 Densities > 0.3 g/cm3  Closed floats for condensing liquids up to 350 bar operating pressure


 Construction in stainless steel grade 316/316L as standard. Also possible in higher grades of stainless steel like 904L or Hastelloy® and Inconel®


/Incoloy® alloys  Casing of indication rail in stainless steel


Many critical components have built-in back-ups so that in case of failure, the system can be switched from the duty to the standby component to maintain production


Simon Rooks is with Tyco Fire and Integrated Solutions. www.tycofis.co.uk


WEKA AG · Switzerland · Schürlistrasse 8 · CH-8344 Bäretswil Phone +41 43 833 43 43 · Fax +41 43 833 43 49 info@weka-ag.ch · www.weka-ag.ch


ARCA Flow Group worldwide: Competence in valves, pumps & cryogenics


For more information ✔ at www.engineerlive.com/iog


Please visit us at our new website: www.weka-ag.ch


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52