carefully monitor and maintain its facilities and building systems to minimize the risk of catastrophic failure. However, delaying critical preventive maintenance and capital renewal work puts even greater pressure on future fiscal years’ budgets as well as employees to keep deteriorating systems running for longer than best practices dictate.


The AOC’s facilities are more than just a collection of buildings. They are landmarks that represent the historic fabric of our nation. Their age and iconic nature dictate that AOC continue addressing the deferred maintenance and capital renewal backlog because it is financially prudent to do so. AOC’s total FY 2014 deferred maintenance backlog and capital renewal requirements are estimated at $1.3 billion. Of this total, over $281 million repre-sents deferred maintenance (see this report’s Required Supplementary Information for more information on deferred maintenance), with the balance comprising AOC’s capital renewal costs.


AOC Initiatives: AOC uses several tools to plan, prioritize and manage the deferred maintenance and capital renewal requirements for Capitol Hill. AOC identifies and ranks projects using Facility Condition Assessments (FCAs), the Five-Year Capital Improvements Plan (CIP) and the draft Capitol Complex Master Plan (CCMP) as tools to assist in prioritizing resources and efforts to ensure the most press- ing requirements are addressed first. The highest priority projects in the near-term include the U.S. Capitol Dome Restoration, Cannon House Office Building Restoration, the Power Plant’s separate Refrigeration Plant Revitalization and Co-Generation projects, Rayburn House Office Building Garage Rehabilitation, Senate Underground Garage Renovations and Landscape Restoration and several critical exterior stone repair projects.


The FCAs allow AOC to identify the most critical needs of each facility. The FCAs are performed by independent contractors to give AOC an unbiased view of which projects should be considered the most urgent. Many of AOC’s buildings and grounds are historic in nature, and these assessments inform the CIP as to which of the facilities are in most danger of serious degradation or disrepair in the short- or mid-term. In this fiscal environment, AOC works to improve its FCA prioritization methods to achieve the greatest return for the least possible cost.


AOC’s five-year CIP is a dynamic planning tool that uses annual funding requirements and the priorities outlined in the CCMP to evaluate capital projects based on their importance and practicality. The CIP considers phasing opportunities, project sequencing and other factors to better facilitate the timing and execution of major deferred maintenance and capital renewal projects. It is updated annually to reflect the most current fiscal restraints and facility requirements and results in an ordered list of projects.


Photo Caption: As with all deferred maintenance, the longer scheduled and necessary preventive maintenance and repairs are delayed, the greater the risk that problems will become worse and more costly. This photo depicts the U.S. Capitol’s House Pediment damage.


The draft CCMP helps to forecast the facility maintenance challenges AOC may face over a 20-year period. It identifies the overarching strategies AOC may pursue to address those long-term challenges. The plan serves as a framework for ensuring and maintaining a quality work environment, including adequate office and support space, stewardship of natural and cultural resources and provision of reliable, energy-efficient infrastructure.


AOC continues to employ a Project Prioritization Process to rank every essential project in its annual budget request. This effectively allows AOC to identify and recommend to the Congress the levels of investment and maintenance required to ensure the facilities remain safe, functional and protected. Due to resource constraints, AOC has found that, in certain cases, it is necessary to phase major projects to better manage the time and resources needed to complete them. The ongoing Dome Restoration Project is an example of this approach. The first phase, the Dome Skirt, was completed on time and below budget, and provided AOC with valuable lessons learned for the future phases of the Dome Restoration Project.


In AOC’s FY 2015 budget request, AOC requested funding for several critical exterior stone projects, including repair work on the U.S. Capitol, Russell Senate Office Building and  

Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132  |  Page 133  |  Page 134  |  Page 135  |  Page 136  |  Page 137  |  Page 138  |  Page 139  |  Page 140  |  Page 141  |  Page 142  |  Page 143  |  Page 144  |  Page 145  |  Page 146  |  Page 147  |  Page 148  |  Page 149  |  Page 150  |  Page 151  |  Page 152  |  Page 153  |  Page 154  |  Page 155  |  Page 156  |  Page 157  |  Page 158  |  Page 159  |  Page 160  |  Page 161  |  Page 162  |  Page 163  |  Page 164  |  Page 165  |  Page 166  |  Page 167  |  Page 168  |  Page 169  |  Page 170  |  Page 171  |  Page 172  |  Page 173  |  Page 174  |  Page 175  |  Page 176  |  Page 177  |  Page 178  |  Page 179  |  Page 180  |  Page 181  |  Page 182  |  Page 183  |  Page 184