PROJECT MANAGEMENT
Confidence assured
Integrated assurance – what is it, why do it and do you need it? Association for Project Management, the largest professional body of its kind in Europe, says it should not be an optional extra but an essential part of good governance. Roy Millard, a senior audit manager at Transport for London and chair of APM’s Assurance Specific Interest Group, explains.
W
ith ever-more complex and costly projects and programmes, key stakeholders and
sponsors need to be sure that everything is going as it should.
Even with all the checks and balances that a professionally-run project should have in place, how accurate is the answer to the inevitable question: ‘Are we on track, are there any issues and will it be delivered as promised?’
The reality may not be what it seems, which could seriously impact on informed decision- making, cost and even the very success of the project. So it is an essential part of robust governance to not only be able to give assurances, but also for stakeholders to have confidence in those assurances.
Which is where integrated assurance comes in. Introducing an overall, independent and shared scrutiny should provide the confidence that stakeholders seek and reduce any risk of failure.
According to ‘A Guide to Integrated Assurance’ from Association for Project Management (APM), assurance exists to ‘support the delivery of successful projects by providing analysis and peer challenge to the project team’s approach’.
One of the guide’s authors, Roy Millard, a senior audit manager at Transport for London and chair of APM’s Assurance Specific Interest Group, said: “Most organisations have to put assurance controls in place because their customers expect it and they may be legally required to do so for aspects such as quality assurance and health and safety.
“The problem is that, too often, this is tackled from a ‘silo’ point of view with no integration across the project, programme or portfolio. By
44 | public sector executive Oct/Nov 14
streamlining the approach to give a joined-up perspective avoids duplication, less in the way of intrusive reviews and provides confidence as well as meaningful control.”
Integrated assurance is based on a comprehensive and shared view and works to avoid gaps and overlaps, making more efficient use of resources. It also means that assurance can focus on key risks and controls and provides an effective and appropriate governance hierarchy. This in turn allows more direct attention to important exposures, areas not well covered and interrelationships across the whole project portfolio.
The key is to strike the right balance between too much time and resources spent on assurance and not enough – both of which can be at the expense of successful delivery. Assurance by volume is no guarantee, and individual stakeholders may each have a different assurance requirement. Establishing an effective, integrated model for your organisation in a way that is neither onerous or an added risk in its own right is crucial.
“Having a long and diverse list of assurance providers may not necessarily be a problem,” states the APM guide. “They may be quite necessary and may each be providing a different perspective. However, there is a risk of duplication between assurance providers that can lead to projects developing a feeling of assurance ‘overload’.”
Then there are external factors such as the environment to consider and so it makes sense that the project’s assurance plan needs to remain dynamic and be continuously reviewed throughout the life of the project.
This is not just another job for the project
manager to add to the already demanding list of tasks. Rather it should be led by a group including sponsors, stakeholders and key managers.
Millard explained: “They can sit back and think it through, look at what can be done about confidence and control and ensure those carrying out assurances and reviews share with others.
“If integrated assurance is carried out properly, it can save money because time isn’t wasted on doing things in the wrong way. There is a small additional cost, but that is mostly in terms of time, which can be outweighed by the benefits to the project.”
Every organisation, every project, programme and portfolio is different, so there can be no proscribed ‘one size fits all’ model for building an integrated assurance plan. However, there are common elements to be considered and best practice to examine.
Roy Millard will be explaining how to create a structured approach in the ‘Master Class’ zone at Project Challenge Expo at Olympia on 15 October. His presentation, ‘Integrated Assurance – how to do it in your organisation’, will look at ways of arranging assurance in such a way that it doesn’t become an onerous burden on projects but contributes to good governance.
Roy Millard FOR MORE INFORMATION
A Guide to Integrated Assurance is available to buy from: W:
apm.org.uk/publications
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76