Technical Envelope VELOPE
Ceramic job: Hundreds of pipes on Sony’s Osaki Home Entertainment HQ release water to cool the building’s facade by up to 12.6o and the surrounding air by 2-3o
C C.
CONSTRUCTION MANAGER | SEPTEMBER 2014 | 41
Technical Envelope VELOPE
Ceramic job: Hundreds of pipes on Sony’s Osaki Home Entertainment HQ release water to cool the building’s facade by up to 12.6o and the surrounding air by 2-3o
C C.
CONSTRUCTION MANAGER | SEPTEMBER 2014 | 41