This page contains a Flash digital edition of a book.
PRODUCT SHOWCASE


NG BAILEY COMPLETES TECHNICAL MILESTONE AT MANCHESTER CENTRAL LIBRARY


N


G Bailey has completed and handed over the paper archive area of Manchester Central Library - marking a key technical milestone in the


ambitious transformation of Manchester’s Town Hall Extension and Central Library. Hundreds of the library’s most historical paper documents have been returned to the archive, following the extensive work to refurbish the lower ground floor archive area as part of Manchester City Council’s project to transform the Grade II listed buildings. This comes as the company completes a full scope of mechanical and electrical services, working alongside main contractor Laing O’Rourke, as part of the three-year construction project to transform the buildings, opening up more of the space to the public than ever before, and improving services while also restoring key heritage features. The renovation of the paper storage rooms was a particularly important part of the project, to preserve the library’s most valuable paper archives in environmental conditions meeting National Archives standards while reducing the carbon footprint, fuel and other operating costs. It involved installing powered racking for the books, pamphlets and other documents, as well as stringent heating and lighting controls.


Mike Darlington, managing director of NG Bailey’s Engineering division, said: “This project has been a real opportunity to use our expertise installing state-of-the-art, 21st century services, into a preserved Grade II listed building.


“It has also been an exciting challenge to meet the standards required as the building is listed. We had to work really hard to install the modern facilities and air conditioning within an existing fabric that couldn’t be touched. Our design and construction teams worked extremely closely with the client and English Heritage to achieve the results. “Alongside this we had to control the humidity of an area with floors made out of concrete - so securing a stable environment with such a porous material was a big achievement for us.”


Councillor Rosa Battle, Executive Member for Culture and Leisure for Manchester City Council, said: “From floor to ceiling to its state-of-the-art facilities, the transformation of Manchester Central Library has been all about painstaking attention to detail. The enthusiastic reactions show that Central Library is a spectacular asset for the city.”


The key to achieving this in the storage rooms was to steadily bring temperature and


humidity down to stable conditions at the agreed set points, which took the team three months to achieve. The conditions in the rooms are being


controlled using a sophisticated Building Management System (BMS), allowing the Manchester City Council team to monitor and watch conditions at a minute level and spot any potentially damaging environmental changes as soon as they occur.


Now complete, the transformed Town Hall Extension and Central Library has provided a bright and spacious ground floor, which was previously closed to the public, into a light and airy space with a cafe,


performance area and film booths. There is also a specialist search room where staff can help readers to access some of the library’s most historic and valuable works, which are stored in the climate-controlled book depositories on the lower floor.


More than 2,000 people passed through the doors of the St Peter’s Square landmark in the first three hours after it reopened.


KAWNEER SYSTEMS HELP NEW SCHOOL GET A BREEAM “EXCELLENT” REPORT


G 38


lazing systems from leading architectural aluminium supplier Kawneer have helped a new £24million school to achieve a BREEAM


“Excellent” rating.


Two types of Kawneer’s curtain walling are complemented by AA®601TE top-hung casement and AA®601TE parallel opening windows as well as AA®605 low/medium duty swing doors and series 10D light/medium-duty commercial entrance doors at The Grange School in Runcorn. Just a few miles from Kawneer’s production facility, the new school features the Kawneer systems, including AA®100 and AA®110 zone-drained curtain walling, with 50mm and 65mm sightlines respectively, throughout four two-storey wings located around a central “heart” space and public hub.


Designed by Aedas architects, who are regular specifiers of Kawneer systems, the in-situ concrete-framed building caters for 1,350 three to 16-year-olds and is shaped to provide learning zones that give identity to its various facilities.


PUBLIC SECTOR ESTATES MANAGEMENT • MAY 2014


A contiguous ribbon of flexible learning space wrapped around the central hub, it maximises natural daylight and ventilation, features that helped with its BREEAM rating. The Kawneer systems, including rooflights above the central hub, were installed by specialist sub-contractor Anaco Systems for main contractor Galliford Try as part of the £50million Halton Building Schools for the Future (BSF) programme. Chris Le Flohic, senior technician with Aedas architects, said: “The Kawneer products were the best and met all the required criteria very well.


“It was the main feature in one location, the main entrance, and it was used to break up the brick façade. It interfaces very well with the other materials but that was one of the reasons it was chosen. It also forms an architectural feature to the library and staff room as it has an expressed noising cap.”


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40