What approximate percentage of the UK’s ‘greenhouse gas’ emissions are accounted for by buildings, according to the recent


Department of Energy and Climate Change (DECC) report?


15% 25% 35% 45% 55%


Approximately how many condensing boiler installations are there in the UK?


Up to 1 million


Between 1 and 4 million Between 4 and 6 million Between 7 and 9 million More than 9 million


What is the percentage of water vapour in the flue gas volume when methane fires a water heater with a lambda of 1.05?


15% 16% 17% 18% 19%


What is the maximum temperature normally required to condense water out of the flue in a natural gas water heater?


10°C 50°C 57°C 60°C 100°C


Which of these is least likely to be included in a continuous flow condensing water heater system?


A combustion fan automatically controlled to provide efficient combustion


A hot water storage tank A gas supply


A cold water supply and/or a return feed from a recirculating domestic hot water service


A drain 48 CIBSE Journal August 2012


Name (please print) ................................................................................. Job title ....................................................................................................... Organisation ............................................................................................. Address ...................................................................................................... ..................................................................................................................... ..................................................................................................................... Postcode .................................................................................................... Email ..........................................................................................................


Are you a member of: CIBSE


If so, please state your membership number (if available) ...............................................................................................


Other institution (please state) .............................................................................................


To help us develop future CPD modules, please indicate your primary job activity:


Building services engineer Mechanical engineer Electrical engineer Commissioning engineer Energy manager Facilities manager


Other (please give details) ................................................................


If you do NOT wish to receive information about Rinnai, the sponsor of this CPD module, please tick here:


By entering your details above, you agree that CIBSE may contact you from time to time with information about CPD and other training or professional development programmes, and about membership of CIBSE if you are not currently a member.


Please go towww.cibsejournal.com/cpd to complete this questionnaire online. You will receive notification by email of successful completion, which can then be used to validate your CPD records in accordance with your institution’s guidance.


Alternatively, you can fill in this page and post it to: N Hurley, CIBSE, 222 Balham High Road, London, SW12 9BS


www.cibsejournal.com


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60