This page contains a Flash digital edition of a book.
9 IWEX 2011 PREVIEW


Biomethane from wastewater...


Many of the advertised ‘ground-breaking’ developments in renewable energy haven’t broken any ground at all – in the sense that they haven’t been built yet in the UK. But .....


• the Chesterfield BioGas upgrading system is now operational in the UK, backed by a long-established British company, and adding to the 30+ sites worldwide employing the same proven technology


• the water-wash process upgrades raw biogas from anaerobic digestion or wastewater treatment and converts it to environmentally friendly fuel


• we offer a full feasibility and technical project development service to provide you with the most economic plant for the volumes of gas you can generate


www.chesterfieldbiogas.com


stephen.mcculloch@chesterfieldbiogas.co.uk Tel: +44 (0) 7773 039 602


...it need not be a game of chance!


See us at


IWEX 2011 part of Sustainability live! Halls 3 & 3a NEC Birmingham


24-26 May 2011 STAND


C20


STRENGTH MATTERS!


• Safely lift up to 1000 Kg • Significantly increases operational safety margins • Easy, rapid manual assembly • Customised to 3m radius


®


A Pressure Technologies group company


FIRST 1000 Kg WLL


WORLD 1000


No. 1 in lightweight, portable, safe lifting solutions T: +44 [0]1291 620796 E: enquiries@reidlifting.com www.reidlifting.com


UK’s first injection of biomethane to grid – Didcot, October 2010


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32