9 IWEX 2011 PREVIEW
Biomethane from wastewater...
Many of the advertised ‘ground-breaking’ developments in renewable energy haven’t broken any ground at all – in the sense that they haven’t been built yet in the UK. But .....
• the Chesterfield BioGas upgrading system is now operational in the UK, backed by a long-established British company, and adding to the 30+ sites worldwide employing the same proven technology
• the water-wash process upgrades raw biogas from anaerobic digestion or wastewater treatment and converts it to environmentally friendly fuel
• we offer a full feasibility and technical project development service to provide you with the most economic plant for the volumes of gas you can generate
www.chesterfieldbiogas.com
stephen.mcculloch@
chesterfieldbiogas.co.uk Tel: +44 (0) 7773 039 602
...it need not be a game of chance!
See us at
IWEX 2011 part of Sustainability live! Halls 3 & 3a NEC Birmingham
24-26 May 2011 STAND
C20
STRENGTH MATTERS!
• Safely lift up to 1000 Kg • Significantly increases operational safety margins • Easy, rapid manual assembly • Customised to 3m radius
®
A Pressure Technologies group company
FIRST 1000 Kg WLL
WORLD 1000
No. 1 in lightweight, portable, safe lifting solutions T: +44 [0]1291 620796 E:
enquiries@reidlifting.com www.reidlifting.com
UK’s first injection of biomethane to grid – Didcot, October 2010
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32