1. BATEMAN’S ROW, SHOREDITCH Client: Theis & Khan Architects Out-turn cost per m2

:

£1,800-£2,000 per m2 Consultants: Theis & Khan acted as both architect and project manager; QS Stephen Cuddy; structural engineer, FJ Samuely & Partners Main Contractor: Silver Interiors Design & Build; groundwork and concrete frame by ECS Groundwork Programme: The contract ran three months over the original programme.

2. NEUES MUSEUM, BERLIN Client: Stiftung Preussischer Kulturbesitz represented by Bundesamt für Bauwesen Gross floor area: 20,500m2 Budget: ¤233m (£210m at 2009 exchange rate) Cost per m2

: ¤10,244

Consultants: David Chipperfield Architects; Julian Harrap Architects; project manager, Ernst & Young Real Estate Newbuild and concrete contractor: Dressler Bau Restoration contractors: Various Programme: Six years in design, six in construction, opened in October 2009

3. ASHMOLEAN MUSEUM, OXFORD Client: University of Oxford, Heritage Lottery Fund Gross floor area: 10,000m2 Budget: Total budget £61m, including construction cost of around £40m Cost per m2

: £6,100

(based on total figure) Contract: Traditional fixed-price JCT Consultants: Rick Mather Architects; Atelier Ten; Dewhurst McFarlane; project manager, Mace Contractor: BAM Programme: Two and half years on site, opened December 2009

4. MAAXI MUSEUM OF THE 21ST CENTURY, ROME Client: Italian Ministry of Culture, working through the Ministry of Infrastructure Form of contract: Design and build Contract value: ¤150m (£133m at 2009 exchange rate) Project size: 24,000 m2 Out-turn cost per m2

:

£5,541 per m2 Consultants: Zaha Hadid Architects; Anthony Hunt Associates; Max Fordham Contractor: JV between Italiana Costruzioni and Societa Appalti Costruzioni. Programme: Contract let December 2002, completion reached in early 2009

5. CLAPHAM MANOR PRIMARY SCHOOL, LAMBETH Client: London Borough of Lambeth Cost: Approx €2.5m, final account yet to be settled Gross internal area: 927m2 Cost per m2

: Approx

€2,696 Form of contract: Traditional, JCT 2005 Consultants: de Rijke Marsh Morgan Architects; structural engineer, Michael Hadi Associates; senior engineer, Fulcrum Consulting; QS, Appleyard & Trew. Main Contractor: The Construction Partnership (formerly Ashe Construction South). Programme: Completed in May 2009, later than specified in the contract.

6. CHRIST’S COLLEGE SCHOOL, GUILDFORD Client: Surrey Country Council Form of contract: Design and Build, JCT 2005, 2 stage lump sum fixed-price contract Contract value: Architect quoted £14.4m, contractor quoted £16.3m. Difference probably lies in prelims plus additional work post-completion, to demolish old school and landscape the site. Project size: 7,350m2 Out-turn cost per m2

:

Based on architect’s figure, £1,960 per m2 Consultants: DSDHA; Atelier Ten; Adams Kara Taylor; Davis Langdon (acting as client’s project manager and QS) Contractor: Wates Programme: August 2007 to Feb 2009

CONSTRUCTION MANAGER | OCTOBER 2010 | 15

UTE ZSCHARNT

HÉLÈNE BINET

ANDY MATTHEWS

Previous arrowPrevious Page     Next PageNext arrow        Smaller fonts | Larger fonts     Go back to the flash version
1  |  2  |  3  |  4  |  5  |  6  |  7  |  8  |  9  |  10  |  11  |  12  |  13  |  14  |  15  |  16  |  17  |  18  |  19  |  20  |  21  |  22  |  23  |  24  |  25  |  26  |  27  |  28  |  29  |  30  |  31  |  32  |  33  |  34  |  35  |  36  |  37  |  38  |  39  |  40  |  41  |  42  |  43  |  44  |  45  |  46  |  47  |  48  |  49  |  50  |  51  |  52  |  53  |  54  |  55  |  56  |  57  |  58  |  59  |  60