1. BATEMAN’S ROW, SHOREDITCH Client: Theis & Khan Architects Out-turn cost per m2


:


£1,800-£2,000 per m2 Consultants: Theis & Khan acted as both architect and project manager; QS Stephen Cuddy; structural engineer, FJ Samuely & Partners Main Contractor: Silver Interiors Design & Build; groundwork and concrete frame by ECS Groundwork Programme: The contract ran three months over the original programme.


2. NEUES MUSEUM, BERLIN Client: Stiftung Preussischer Kulturbesitz represented by Bundesamt für Bauwesen Gross floor area: 20,500m2 Budget: ¤233m (£210m at 2009 exchange rate) Cost per m2


: ¤10,244


Consultants: David Chipperfield Architects; Julian Harrap Architects; project manager, Ernst & Young Real Estate Newbuild and concrete contractor: Dressler Bau Restoration contractors: Various Programme: Six years in design, six in construction, opened in October 2009


3. ASHMOLEAN MUSEUM, OXFORD Client: University of Oxford, Heritage Lottery Fund Gross floor area: 10,000m2 Budget: Total budget £61m, including construction cost of around £40m Cost per m2


: £6,100


(based on total figure) Contract: Traditional fixed-price JCT Consultants: Rick Mather Architects; Atelier Ten; Dewhurst McFarlane; project manager, Mace Contractor: BAM Programme: Two and half years on site, opened December 2009


4. MAAXI MUSEUM OF THE 21ST CENTURY, ROME Client: Italian Ministry of Culture, working through the Ministry of Infrastructure Form of contract: Design and build Contract value: ¤150m (£133m at 2009 exchange rate) Project size: 24,000 m2 Out-turn cost per m2


:


£5,541 per m2 Consultants: Zaha Hadid Architects; Anthony Hunt Associates; Max Fordham Contractor: JV between Italiana Costruzioni and Societa Appalti Costruzioni. Programme: Contract let December 2002, completion reached in early 2009


5. CLAPHAM MANOR PRIMARY SCHOOL, LAMBETH Client: London Borough of Lambeth Cost: Approx €2.5m, final account yet to be settled Gross internal area: 927m2 Cost per m2


: Approx


€2,696 Form of contract: Traditional, JCT 2005 Consultants: de Rijke Marsh Morgan Architects; structural engineer, Michael Hadi Associates; senior engineer, Fulcrum Consulting; QS, Appleyard & Trew. Main Contractor: The Construction Partnership (formerly Ashe Construction South). Programme: Completed in May 2009, later than specified in the contract.


6. CHRIST’S COLLEGE SCHOOL, GUILDFORD Client: Surrey Country Council Form of contract: Design and Build, JCT 2005, 2 stage lump sum fixed-price contract Contract value: Architect quoted £14.4m, contractor quoted £16.3m. Difference probably lies in prelims plus additional work post-completion, to demolish old school and landscape the site. Project size: 7,350m2 Out-turn cost per m2


:


Based on architect’s figure, £1,960 per m2 Consultants: DSDHA; Atelier Ten; Adams Kara Taylor; Davis Langdon (acting as client’s project manager and QS) Contractor: Wates Programme: August 2007 to Feb 2009


CONSTRUCTION MANAGER | OCTOBER 2010 | 15


UTE ZSCHARNT


HÉLÈNE BINET


ANDY MATTHEWS


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60