4
2
6
1
5
NICK KANE
3
1. BATEMAN’S ROW, SHOREDITCH Client: Theis & Khan Architects Out-turn cost per m2
:
£1,800-£2,000 per m2 Consultants: Theis & Khan acted as both architect and project manager; QS Stephen Cuddy; structural engineer, FJ Samuely & Partners Main Contractor: Silver Interiors Design & Build; groundwork and concrete frame by ECS Groundwork Programme: The contract ran three months over the original programme.
2. NEUES MUSEUM, BERLIN Client: Stiftung Preussischer Kulturbesitz represented by Bundesamt für Bauwesen Gross floor area: 20,500m2 Budget: ¤233m (£210m at 2009 exchange rate) Cost per m2
: ¤10,244
Consultants: David Chipperfield Architects; Julian Harrap Architects; project manager, Ernst & Young Real Estate Newbuild and concrete contractor: Dressler Bau Restoration contractors: Various Programme: Six years in design, six in construction, opened in October 2009
3. ASHMOLEAN MUSEUM, OXFORD Client: University of Oxford, Heritage Lottery Fund Gross floor area: 10,000m2 Budget: Total budget £61m, including construction cost of around £40m Cost per m2
: £6,100
(based on total figure) Contract: Traditional fixed-price JCT Consultants: Rick Mather Architects; Atelier Ten; Dewhurst McFarlane; project manager, Mace Contractor: BAM Programme: Two and half years on site, opened December 2009
4. MAAXI MUSEUM OF THE 21ST CENTURY, ROME Client: Italian Ministry of Culture, working through the Ministry of Infrastructure Form of contract: Design and build Contract value: ¤150m (£133m at 2009 exchange rate) Project size: 24,000 m2 Out-turn cost per m2
:
£5,541 per m2 Consultants: Zaha Hadid Architects; Anthony Hunt Associates; Max Fordham Contractor: JV between Italiana Costruzioni and Societa Appalti Costruzioni. Programme: Contract let December 2002, completion reached in early 2009
5. CLAPHAM MANOR PRIMARY SCHOOL, LAMBETH Client: London Borough of Lambeth Cost: Approx €2.5m, final account yet to be settled Gross internal area: 927m2 Cost per m2
: Approx
€2,696 Form of contract: Traditional, JCT 2005 Consultants: de Rijke Marsh Morgan Architects; structural engineer, Michael Hadi Associates; senior engineer, Fulcrum Consulting; QS, Appleyard & Trew. Main Contractor: The Construction Partnership (formerly Ashe Construction South). Programme: Completed in May 2009, later than specified in the contract.
6. CHRIST’S COLLEGE SCHOOL, GUILDFORD Client: Surrey Country Council Form of contract: Design and Build, JCT 2005, 2 stage lump sum fixed-price contract Contract value: Architect quoted £14.4m, contractor quoted £16.3m. Difference probably lies in prelims plus additional work post-completion, to demolish old school and landscape the site. Project size: 7,350m2 Out-turn cost per m2
:
Based on architect’s figure, £1,960 per m2 Consultants: DSDHA; Atelier Ten; Adams Kara Taylor; Davis Langdon (acting as client’s project manager and QS) Contractor: Wates Programme: August 2007 to Feb 2009
CONSTRUCTION MANAGER | OCTOBER 2010 | 15
UTE ZSCHARNT
HÉLÈNE BINET
ANDY MATTHEWS
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60