Page 9 of 60
Previous Page     Next Page        Smaller fonts | Larger fonts     Go back to the flash version

Measure PDF drawings 70% faster with Bluebeam PDF Revu

A Quantity Surveyor completed an estimation for a four-floor, 1,500 room London hospital 70% faster with Bluebeam PDF Revu. By using Bluebeam's built-in area and perimeter measurements and custom annotation features, the Quantity Surveyor was able to meet his 3-day deadline and provide the project contractor with measurements for 10 different floor coverings.

Calibrate your PDF drawing and take

measurements electronically

Apply a

custom colour to each

measurement annotation

Read the case study bluebeam.com/surveyor

CL0193 Construction Manager 23/09/2010 09:47 Page 1 Innovation in insulation

How ‘two little ducks’ can help you reach the new Building Regulation emissions target.

25% 25% 25%

Celotex offer new and innovative solutions to help you meet all of your design needs. Our new super low lambda of 0.022W/mK makes Celotex products more thermally efficient than other typical PIR products and up to 100% more efficient than many mineral fibre products, helping you to achieve the 25%

reduction in CO2 emissions called for in the revised Building Regulations.

Building Regulations Part L Reducing CO2 Emissions October 2010 For illustration purposes only. Discover more at celotex.co.uk/ducks

We know insulation inside and out

Export

measurements to Excel

for further calculations

© 2010 Bluebeam Software, Inc.

EXCEL

Previous arrowPrevious Page     Next PageNext arrow        Smaller fonts | Larger fonts     Go back to the flash version
1  |  2  |  3  |  4  |  5  |  6  |  7  |  8  |  9  |  10  |  11  |  12  |  13  |  14  |  15  |  16  |  17  |  18  |  19  |  20  |  21  |  22  |  23  |  24  |  25  |  26  |  27  |  28  |  29  |  30  |  31  |  32  |  33  |  34  |  35  |  36  |  37  |  38  |  39  |  40  |  41  |  42  |  43  |  44  |  45  |  46  |  47  |  48  |  49  |  50  |  51  |  52  |  53  |  54  |  55  |  56  |  57  |  58  |  59  |  60