Key criteria RockTron had four key criteria for the weighing and driver self- loading systems: • Minimal staffing levels for vehicle control, weighing and loading operations. •Fully integration with the existing RockTron sales order system. •A robust and resilient system design to ensure 24/7 operation. •To replace the normal out-loading procedures using a weighbridge.
The solution To meet all of the RockTron operation requirements Precia- Molen designed an innovative bespoke GeneSYS3 based, weighing and site management system. The three VS400 18 metre long surface mounted weighbridges installed at the site allow vehicle arrivals 24 hours a day, receive despatch instructions, load, weigh and exit in an entirely automated operation. Precia-Molen also supplied a BT lorry loading weigher, which is believed to be the first of its type installed in the UK, with full Board of Trade approval; so avoiding the need to install a very long weighbridge and still maintain full driver operated control.
Precia-Molen provided a complete turn-key package incorporating all seven driver consoles, traffic barriers and traffic light control as well as the electronic arrivals message board. Additionally, Precia-Molen configured and installed all of the hardware and software for the system.
Operation
All incoming drivers arrive at the cab height BI300 Driver Console, where via a dialogue display are asked to input a unique identification number, whereupon the GeneSYS3 system validates that the vehicle is an authorised user of the site and dispenses an RFID card to the driver.
This vehicle is then held in the lorry reception park and is updated via the electronic message board display. Once a loading point is available the vehicle is invited to proceed to the entry barrier and console where the driver presents his badge, the barrier opens and he is directed to the loading point. Once the vehicle is positioned on the weighbridge, under the
Designed, Engineered and Constructed by the Motherwell Bridge In House Team
Renewable Energy Solutions
Motherwell Bridge provide a Total Turnkey Solution to the following industries
Biomass Bio Gas / Anaerobic Digestion Wood and Straw Pelleting CHP – Combined Heat and Power Installations
Motherwell Bridge Ltd. The Bridgeworks Logans Road Motherwell, Scotland ML1 3NP Telephone +44 (0)1698 266111 Facsimile +44 (0)1698 269774 Email
info@mbgroup.com www.motherwellbridge.com
August 2010 • Solids & Bulk Handling 15
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68