This page contains a Flash digital edition of a book.
Feature 4 | Norway’s maritime iNdustries
Polarkonsult adds to its PK 100 range
Polarkonsult is expanding its range with its PK-156 heavy-lift vessel.
P
olarkonsult has announced its latest
ice class design the PK-156 an ice
strengthened multi purpose ship
designed for extreme heavy-lift operations,
as well as general cargo transportation.
The ship is fitted with retractable
thrusters aft and tunnel thrusters forward
for DP2 operations. The super heavy-lift
Technical ParTiculars
PK-156 heavy-lift vessel
length o,a .......................................168,40m
Breadth mld ......................................27,00m
Depth to1.deck ................................14.30m
Draught ................................................9,00m
Deadweight ............................16,000tonnes
speed ............................................... 19knots
Ga Plan of PK-156 heavy-lift vessel.
Fuel oil, hFO and MDO ...................1.740m³
Water ballast ..................................16.000m³
One hold, total volume ................23.700m³ design offers a total loading capacity of 2 under way with ship owners interested in
heavy-lift cranes, main ........2x1.000tonnes x 1000tonnes and has been designed for the design.
crane, stern ..................................250tonnes ‘open-hatch’ operation. Mr Sørensen points out: “That the
Main engine, 2 stroke ................... 14.000kW Sigmund Sørensen highlights the ship’s market is not so hot and that orders are
retractable thruster aft ............. 1x1.500kW characteristics: “The vessel features big taking time to come through”, even so Mr
Tunnel thrusters fwd .................... 2x2.000kW cranes with extra lift capacity; also, it has Sørensen feels confident that there will be
accomodation ........................... 26 persons Ice Class and can work at DP2.” orders for the PK-156 design. “At this time
class authorites ................. ice1a - DynPos ? The PK-156 design was developed in most of the market is suffering, but vessels
auTr (DP2)-clean 2008 and has been offered to the market ordered today will not be in the market
earlier in 2009. To date discussions are before 2012,” he adds. NA
the latest ice Class heavy-lift design from PolarKonsult.
68 The Naval Architect January 2010
NA Jan 10 - p68.indd 68 12/01/2010 10:07:00
Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80