POWER GENERATION
POWER GENERATION
LOOKING TO FUEL YOUR LIVE EVENT? TPi SHOWCASES SOME OF THE MOST
REPUTABLE TEMPORARY POWER SERVICES CURRENTLY AVAILABLE...
FOURTH GENERATION picked for their knowledge and experience of the live
A company designed to serve the temporary power event market. They are particularly skilled in a rapid
needs of the live industry, Fourth Generation specialises and efficient turnaround of equipment, providing a
in concert tours, television, sporting and large scale consistency that is particularly appreciated by their
corporate and private events. touring clients.
Providing a wide range of rental generators for all As an RDCO (Registered Dealers in Controlled
temporary power applications and locations, Fourth Oils) agent, Fourth Generation also provides total
Generation worked hand in hand with leading industry fuel management for its clients. Tweed Hurlocker
partners to develop an elite standard of equipment for stated: “We pride ourselves on providing a complete
its generator inventory. turnkey pricing package with no hidden cost to the
The FG 440 kVA twinpack and FG 500 kVA production.”
generators were custom-built and designed specifically
www.fourthgenerationltd.com
for live event applications. Incorporating Volvo
Penta marine engines and Stamford alternators with POWER LOGISTICS
Woodward electronics, they have been built with Queen + Paul Rodgers, Bon Jovi and Nickleback
special attention paid to size, noise level and technical are among the international touring clients to have
specifications. Using the latest in sound insulation benefited from Power Logistics’ temporary power
and muffler design, these machines operate at below services over the last two years. The company has
standard noise levels. established one of the most enviable track records
In addition Fourth Generation offers a full range of in temporary events power, having worked with the
distribution and cable packages, work lights and cable highest profile clients in the live music production and
ramps. festival worlds.
The company was founded by Anthony ‘Tweed’ In the festival supply sector, Power Logistics has
Hurlocker following a successful worldwide career invested in new generators to supply events such as
within the power generation sector of the live V Festival, The Big Chill, T4 On The Beach, and ‘La
event and entertainment industries. With 20 years Machine’ (the spider in Liverpool). It was also involved
experience in North & South America, Europe, Asia, in the first four concerts at the new Wembley Stadium
Australia and the Far East, he is ideally placed to advise (Live Earth, Concert For Diana, Muse and George
on every aspect of powering events in both domestic Michael).
and foreign markets. Flexibility has been the key to Power Logistics’
Overseeing all levels of power project success, with the ability to offer a service as focused or Top: Fourth Generation FG 440 kVA
management, Fourth Generation ensures that the as wide ranging as the client requires. While concert twinpack generators and (middle of page)
equipment, transportation and health and safety production demands a regulated failsafe supply in all the company’s ‘Tweed’ Hurlocker.
elements of a project are taken care of. Crew are hand types of venue, festivals require the installation of an Above: Shaun Pearce of Pearce Hire.
72 • TPi MARCH 09
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88