ANALYSIS & OPINION: TEST & MEASUREMENT
AUTOMATIC PILOT
THE IMPORTANCE OF REBOOTING TEST PROCESSES FOR THE ‘NEW NORMAL’
KOJI OKAMOTO C
ommunication service providers (CSPs) worldwide have risen to the challenge of escalating network demand in recent months, as an increase in remote
working and online learning strained fibre networks to the limits. Yet, even as lockdowns have eased, CSPs
still need to keep front-line technicians safe by limiting their time in the field – while adhering to social distancing guidelines. At the same time, service activation and operation are becoming ever more complex, as next-generation networks span many diverse technologies and legacy systems. To address these converging challenges,
fibre network operators are looking for ways to make field operations faster and more efficient, allowing front-line technicians to reduce time in the field even as they deploy, maintain and optimise networks. One option is greater use of test process automation (TPA) to replace manual and error-prone processes, enabling field techs of all skill levels to address today’s challenges. By improving test process efficiency, field
technicians can more easily address issues such as components that are defective or damaged during installation, pressure to meet daily quotas leading to human error, and
24 FiBRE SYSTEMS n Issue 29 n Autumn 2020
exceedingly complex deployment processes that are difficult and time-consuming, leading to faster deployment and more effective troubleshooting.
Step by step At its most basic level, TPA ensures that each instrument and system is designed to optimise technician workflows. Ultimately, the goal is to enable novice
technicians to deliver expert-level test results, while helping them to close projects the first time, to avoid repeat site visits. Each step of the process is automated
to ensure that the proper test sequence is executed, resulting in consistent service results without wasting time. If a step is skipped due to a manual process,
simple fibre connector issues can be missed, potentially leading to poor network quality, delayed time-to-market for new services and increased churn. Greater process automation enables
efficiency of field operations to be improved, while also confirming that critical tests and documentation tasks are completed to ensure high-quality network operations. A successful TPA initiative accomplishes a
number of goals, including:
www.fibre-systems.com
@fibresystemsmag
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46