search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
Keeping it in the family


Daan Balk looks back over seven generations of family ownership and discusses the fundamentals that have helped Balk Shipyard grow into one of the most trusted and technically proficient shipyards in Europe


and have been fundamental to the growth and success of the business.


A


Today, Daan Balk, CEO and seventh generation of the Balk family sits at the helm of the Shipyard and is steering the business forward supported by a team of over 50 experienced and highly skilled individuals.


Daan explains, “Through the years we built, maintained and renovated ships for the Dutch market. In 2002 we were even granted an exclusive Royal Seal of Approval which symbolises the confidence that the Dutch Royal Family has in our company.”


“Due to the land reclaiming of the inland sea in the 1950s, which caused Elburg to become a small harbour on inland waters, and the growing demand there was a need to relocate and expand. In 2004 the decision was made to relocate the company to the town of Urk, which is located directly on open waters. In Urk we bought a larger existing shipyard and completely transformed it into a modern state of the art facility which answers to the new build and refit needs on the domestic and international markets.”


THE YARD AND FACILITIES “Over the past 15 years,” Daan explains, “our focus was mainly on our projects but we have also been investing in our facilities which consist of three large conditioned halls and three outside parking tracks compliant with the latest environmental requirements.


26 | SPRING 2021 | ONBOARD


pproximately 220 years ago, the Balk Shipyard was founded in the small town of Elburg. Today, many of the same values still hold true


“One hall is fully dedicated to aluminum construction and fabrication, mainly for our own projects as well as for some well respected Dutch shipyards such as the Feadship organisation (Royal Van Lent and Koninklijke De Vries Scheepsbouw), Heesen and many others, plus others across the seas and outside of Europe.”


Daan continues, “Another hall is a refit facility in which we can run two projects at the same time, for example a 45m and a 50m yacht can fit alongside each other. Our warehouse and dedicated workshops are created directly on side in this refit facility. Our third hall is the largest one; here we run major projects which can vary from a really large refit project to a new build.”


“Next to our facilities on the yard, we also have some mooring spaces within the protected boarders of our premises. These mooring spaces are of course equipped with proper shore power and running water.”


“Last but definitely not least, we have a unique lifting system which enables us to haul out and launch yachts up to 1000 tons dead weight and a total length of +65m. With this lift system we can easily haul out and park the yacht in one of our designated halls within a couple of hours at a competitive rate.”


©GeBo Fotografie


Separate from the yard facilities, Balk have the availability of a crew house since late 2020. It’s a beautiful house in one of the best preserved old town centres of The Netherlands, Urk’s neighbouring town, Kampen, The house is located in the city centre, right next to the river IJssel, Kampen has everything you expect of a middle sized town, such as two train stations, one with a direct connection to Amsterdam and Lelystad and a bus station with a direct connection to Urk. In the town centre you will find a large variety of shops, including a cinema and many bars and restaurants. Kampen is a 40 minute


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132  |  Page 133  |  Page 134  |  Page 135  |  Page 136  |  Page 137  |  Page 138  |  Page 139  |  Page 140