search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
modular


Modular build delivers Romford academy at speed


T


HE McAvoy Group has completed an £8.2m contract for the design and offsite construction of a new 630- place primary school for Concordia Academy in Romford.


The 2,972 sqm three-form entry free school has created an exemplar learning environment for local children, reflecting the academy’s vision and ethos, increasing parental choice, and providing a valuable facility for the community. Funded by the Department for Education via the Education & Skills Funding Agency, the school is operated by REAch2 Academy Trust – the largest primary-only academy trust in the UK. The use of a McAvoy offsite solution for the project allowed the development of a highly constrained brownfield site. Commenting on the new school, Raheel Akhtar, Headteacher at Concordia Academy said: “The new school provides much needed primary school places for the local community in Romford. It has created an inspiring environment for high quality education provision, and an outstanding school to help every child realise their highest aspirations. Our children are benefiting from plenty of space in the teaching areas, there is lots of natural light and the main hall is a good size with excellent acoustics.” On this project, the solution from McAvoy enabled the development of a very restricted and challenging brownfield site. The new building is just 1.5m from the site boundary to the front elevation. The new state-of-the-art school is helping to address the urgent need for additional primary places in the South East. The London Borough of Havering


has seen a significant increase in birth rates and this is projected to continue. The local population is set to rise by 11.2 per cent by 2021, further intensifying the pressure on school places.


Designed by Blue Sky Architects, the Concordia scheme has curriculum areas organised in clusters of three for each year group, and with a linear band of classrooms either side of a central corridor. The teaching spaces are designed to be flexible, allowing adaptation to support future modes of curriculum delivery or advances in technology.


Facilities include a music and drama studio, main hall with adjacent smaller hall, 14 classrooms, full catering kitchen, activity room, small group learning rooms, staff room and administration offices. The design solution maximises the external play space within the site and the landscaping has created a positive external environment to reflect and support the school’s educational needs. There is a


24 educationdab.co.uk


hard-surfaced games area for high-energy play; an informal outdoor learning area with tensile fabric canopy to provide a shaded area; a garden space with raised planting beds, and a dedicated, secure reception play area along the southern elevation. The contemporary design for the new school combines strong lines, bold geometric shapes and a palette of materials that includes red brick, timber- effect cladding, render and high levels of glazing. Elements of colour provide bright accents to reflect the school’s corporate identity and emphasise the architectural features. There are brick and rendered bays to the curriculum wing, with full height glazing to the recessed areas which allow light into the break-out and circulation spaces.


www.mcavoygroup.com/education www.blueskydesignservices.co.uk


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49